Carrier AC1B Installation And Start-Up Instructions Manual Download Page 8

© 1993 RESCO

P.O. Box 1667, Indianapolis, IN 46206

13058r

—8—

1093

Catalog No. 92-33AC-1B1

Summary of Contents for AC1B

Page 1: ...nts Recognize safety information This is the safety alert symbol When you see this symbol on the unit and in instructions or manuals be alert to the potential for personal injury Understand the signal...

Page 2: ...bing requirements beyond 50 ft consult Long Line Application Guideline which is available at your local distributor NOTE In some cases noise in the living area has been traced to gas pulsations from i...

Page 3: ...er Connect Diameter Tube Diameter 024 3 8 3 8 5 8 5 8 030 036 3 8 3 8 3 4 3 4 042 048 3 8 3 8 7 8 7 8 060 3 8 3 8 7 8 1 1 8 Tube diameters are for lengths up to 50 ft For tubing lengths greater than 5...

Page 4: ...r brazing After wrapping the service valve with a wet cloth the tubing set can be brazed to the service valve using either silver bearing or non silver bearing brazing material Consult local code requ...

Page 5: ...nd increase the transformer capacity or split the load with an accessory transformer as required PROCEDURE 6 COMPRESSOR CRANKCASE HEATER A crankcase heater is required if the refrigerant tubing is lon...

Page 6: ...this information your dealer may be able to offer helpful suggestions over the telephone or save valuable time through knowledgeable preparation for the service call PROCEDURE 2 REGULAR DEALER MAINTE...

Page 7: ...U BRN HC NOTES 1 REFER TO UNIT LABEL WIRING DIAGRAM FOR WIRE COLORS IFR IFM AND LLS ARE LOCATED INDOORS ON HEATING COOLING APPLICATIONS IF ACCESSORY IFR IS REQUIRED FOR COOLING ONLY APPLICATIONS LOCAT...

Page 8: ...1993 RESCO P O Box 1667 Indianapolis IN 46206 13058r 8 1093 Catalog No 92 33AC 1B1...

Reviews: