
START-UP CHECKLIST
(Remove and Store in Job Files)
I. PRELIMINARY INFORMATION
MODEL NO.: ______________________________________
SERIAL NO.: ______________________________________
DATE: ___________________________________________
TECHNICIAN: _____________________________________
II. PRESTART-UP (Insert check mark in box as each item is completed)
( ) Verify that all packing materials have been removed from unit
( ) Remove all shipping hold down bolts and brackets per installation instructions
( ) Check all electrical connections and terminals for tightness
( ) Check that indoor (evaporator) air filter is clean and in place
( ) Verify that unit installation is level
( ) Check fan wheel, and propeller for location in housing/orifice and setscrew tightness
III. START-UP
ELECTRICAL
SUPPLY VOLTAGE: ______________________________________
COMPRESSOR AMPS: ____________________________________
INDOOR (EVAPORATOR) FAN AMPS: ________________________
TEMPERATURES
OUTDOOR (CONDENSER) AIR TEMPERATURE: __________________________DB
RETURN-AIR TEMPERATURE: ___________________DB ___________________WB
COOLING SUPPLY AIR: ___________________DB ___________________WB
PRESSURES
REFRIGERANT SUCTION:___________________ PSIG, SUCTION LINE TEMP*:___________________
REFRIGERANT DISCHARGE:___________________ PSIG, LIQUID TEMP**:___________________
( ) VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS
* Measured at suction inlet to compressor
**Measured at liquid line leaving condenser.
Page 27