START-UP
Pre-Start Check —
Once installation is complete, make
the following pre-start checks:
1. All indoor and outdoor units are properly installed.
2. All piping and insulation is complete.
3. All electrical connections (both power and control) are
properly terminated.
4. All condensate drains are installed correctly.
5. The power supply is the right voltage and frequency.
6. The units are properly grounded in accordance with
current electrical codes.
7. Suction and liquid line service valves are in the open
position.
Drain Pump and Drainage Test —
Follow these
steps to perform the test:
1. Remove the test cover by rotating it counter-clockwise as
shown in Fig. 33.
Fig. 33 —Test Cover
2. Use a piece of tubing or pipe to fill the drain pump
reservoir with 70 oz. of water as shown in Fig. 34 below.
Fig. 34 —Tube/Pipe Insert
3. Turn the unit ON in cooling mode. The pump comes on.
Watch the end of the drain pipe for any water. It may take
time for the water to travel depending on the length of the
drain pipe.
4. During this test, check any bends or joints for leakage.
System Operation Check —
Once the installation
and pre-start checks are complete, perform the following steps:
1. Using the remote controller, select cooling or heating
mode to check the operation of the system.
2. While the system is in operation, check the following on
the indoor unit:
a. Switches or buttons on the remote controller are
easy to push.
b. Indicator light is showing normal operation and no
error is indicated.
c. Swing mode of air louvers is working (if
applicable to unit).
d. Drain pump operation is normal (if applicable).
e. No abnormal vibration or noise.
IMPORTANT: The system can connect 64 indoor units
with different system addresses. If two indoor units in the
same system have identical addresses, abnormal operation
will occur.
LEGEND
ACB
—
Auxiliary Control Board
FAN
—
Output for fan Operation
CTON
—
Output for Cooling Operation
HTON
—
Output for Heating Operation
AUXH
—
Output for Auxiliary Heat
MAX AMPS
1A
MAX VOLTAGE
24V
CN50
CN51
ACB interface
FAN CTON HTON AUXH
C
L O
S ED
O
P
E
N
E
D
O
O
CSL
P E N
Test Cover
Tube/Pipe