40
5. Remove the side panel of the FS box control board. A
control wire harness will be included with the FS box
(See Fig 57).
Fig. 57 - FS Box with Panel Removed
6. Connect the green connector of the control wire to
CN02 on the FS box control board. Apply the plastic
strain relief mounted to the FS box. See Fig. 58.
CN02 Connecon
Plasc Strain
Relief
Fig. 58 - CN02 Connector and Plastic Strain Relief
7. On the other end, connect the black connector to
CN81 on the rooftop unit control board and push the
ferrite core through the rubber bushing to provide
strain relief. Then bundle and tie the extra wire.
CN81
Connecon
Fig. 59 - CN81 Connector
Ferrite Core
Fig. 60 - Ferrite Core
8. Knock out the hole on the back of the FS box and
install a Romex connector (field- supplied) in the hole
as shown in Fig. 61. A power wire will be included
with the FS box.
Romex
Connector
Fig. 61 - Romex Connector
9. Connect the red connector on the power wire to CN01
on the FS box control board and use the Romex
connector as strain relief as shown in Fig. 62.
CN
01
Connecon
Fig. 62 - CN01 Connection
40Q
Q
Summary of Contents for 40QQ Series
Page 3: ...3 DIMENSIONS 1 2 3 Fig 2 Dimensional Drawing 40QQ ...
Page 4: ...4 DIMENSIONS CONT Fig 3 Dimensional Drawing 40QQ ...
Page 5: ...5 CENTER OF GRAVITY Fig 4 Center of Gravity Drawing 40QQ ...
Page 11: ...11 Fig 8 Rigging Label 40QQ ...
Page 50: ...50 Table 29 Check Code 2 40QQ ...
Page 51: ...51 Table 30 Check Code 3 40QQ ...
Page 52: ...52 WIRING DIAGRAMS Fig 78 40QQ Power Wiring Diagram 208 230V 60Hz 40QQ ...
Page 53: ...53 WIRING DIAGRAMS CONT Fig 79 40QQ Power Wiring Diagram 460V 60Hz 40QQ ...