background image

PLUMBER'S INSTALLATION INSTRUCTIONS 

WATER EFFICIENT - CONNECTED TAPWARE ENABLED BY AWARE

ELECTRONIC WALL MOUNTED OUTLET(REMOTE)

TM

IS1812A(12/18)

Sheet 1 of 2

1)

2)

3)

Fit elbow (1) onto wall or noggin in the wall and secure using three

screws (2) through the holes in its base. 

Important: Before tightening,

vertical alignment must be checked by using flat face on the LH side

of elbow (1).

Installation

Determine the location of the control box (sheet 2) and fit 

conduits between the elbow (1) and control box. 

Important: The top end of the conduit must be installed right

up to the rear of elbow (1) face, as shown in Fig. 3.

Pressure test: Remove the pressure test plug (3)  by removing four M4

screws (4) using ball end allen key (16)  before turning the mains on.

Flush the system to remove air & foreign material. Remove pressure from

the system then fit the pressure test plug (3) and pressure test in

accordance with the requirements of AS/NZS 3500.1. After pressure test,

release pressure in the lines by partially unscrewing four M4 screws (4).

Pass through the male end (14) of the extension cable (15) into the

conduits until the male end (14) is through the conduits. Then

unscrew one of the screw (4) and partially install it on positon

shown in 

Fig.2 . By using wire tie (5) tie one end to the screw (4) in

the centre, and other end to female end (6), then fit the protective

cap (7) over the elbow (1), as shown in Fig. 3 & 4.

4)

50

6 0 - 7 0 m m

Fig. 4

7

8

9

10

11

12

13

RECOMMENDED

Cut flush with
wall/tile face

wall/tile face

Fig. 1

4

Fig. 2

Fig. 3

Flat face 

3

1

2

To conduits

16

IMPORTANT

It is the installers responsibility to ensure the
installation complies with AS/NZS3500.1, 
AS/NZS3500.2, AS/NZS3500.4.1, AS/NZS3500.4.2
and local water authority regulations.

Refer to side 2 of this instruction for control box installation

Important Information

Not suitable for gravity feed systems.

*

*

All pipework must be thoroughly flushed prior to installation, 

as foreign materials may block the flow regulating device and 

reduce the flow of water. Note: Aerator insert must be 

retightened to prevent removal by hand.

*

Wall outlet is fitted with a flow regulated aerator insert. 

This low flow rate may not be suitable for connection to 

some Instantaneous Gas Water Heaters, some Tempering

Valves, some Solar Water Heaters & some Thermostatic 

Mixing Valves. 

Check with the manufacturers of these products.

After the wall/tile face has been completed, cut protective cap (7)

with sharp knife flush against wall/tile face. (See 

Fig. 4). 

Important : Extreme care must be taken while cutting the cap (7)

so the cable (16) does not get cut. Cable can be partially seen 

through the protective cap (7).

5)

Remove the M4 screws (4) retaining the pressure test plug (3) 

and pull pressure test plug (3)  along with the wire tie (5) 

and female end (6). Discard the pressure test plug (3) and 

wire tie (5).

6)

Connect Outlet cable end (8) with extension cable end (6), then

Align & attach outlet spout assembly (9) to wall elbow (1), ensuring

cable does not become jammed or damaged.

7)

By using the ball end allen key  retain the spout (9) using 

a ball ended 3mm allen key.

8)

Slide wall cover plate (11) together with seal (10) along spout (9)

until cover plate seal (10) contacts wall/tile face, tighten grub 

screw (12) using a 2mm allen key (13). DO NOT OVER TIGHTEN.

9)

Commissioning Procedure:

a)Power on the device at the GPO and allow the unit to

    complete the calibration sequence as follows:

       1) The indicator LED starts blinking.

       2) The indicator LED will turn off for 2 to 3 seconds performing

            calibration then a small amount of water will discharge. 

       3) The unit is now ready to operate.

b) Test operation by placing hands under the sensor (within 100mm from

Spout).

     Water should flow within 0.5 seconds.

     Remove hand and the water supply should stop within 2 seconds.

11)

10)Control Box : Follow instructions on Sheet 2 to install control box and

connect male end (14) of extension cable (15) to female end of control

box cable, before the commissioning procedure.

3 5

5

6

7

To conduits

Female end

Conduit must be installed

right upto this face.

6

14

15

Reviews: