weatherproof seal cap.  If dimming is to be utilized, cut 
off the weaterproof cap and strip back the cables.  Route 
the dimming wires in accordance with B.a and connect 
to incoming control wires.  

NOTE:  

The seal cap on the 

dimming cable shall not be removed unless the 0-10V 
function shall be utilized and connected in accordance 
with these instructions. 

d.

 

347V AND 480V SYSTEMS 

For fixtures optioned with the T3 or T4 option, a 750VA 
Toroidal transformer will be factory integrated into the 
luminaire to step down incoming power to 277V.  The 
enclosure will include a dedicated weatherproof cord 
grip for incoming power and outgoing power to the 
luminaire.  The wiring from the transformer to the 
luminaire will be factory assembled and shall not be 
modified in the field.  The incoming power wires will 
include a field ready butt splice joint.  Route the 
incoming power via a 16/3” SO cable through the cord 
grip and connect incoming power to the supplied butt 
splice joints.   Once wiring is complete, ensure the cable 
grip is properly tightened on the incoming power cable.  

WARNING: 

 In a L-N-G system, ensure the system 

neutral is connected to the incoming white wire only.  G 
is exclusively reserved for electrical ground and B is 
always hot (Line).   

 

AIMING PREPARATION 

 
Prior to aiming of the flood lighting fixtures, it is critical to ensure the 
proper distributions are located in the appropriate location on the support 
structure.  The label on the underside will show the complete part number 
including the light distribution.  Distributions are in degrees and include 
15D, 20D, 30D, 45D and 60D beam angles. Distributions should be matched 
to the supplied aiming array illustrating the fixture array, aiming angles and 
specific distribution. 

DEGREE AIMING 

The DSF is provided with a horizontal and vertical aiming indicator.  These 
aiming indicators can be used for general aiming indication.  

NOTE:

 If 

precision aiming is required, the target aiming process should be followed.  
Contact CHM for detailed target aiming instructions.   

In the pre-aimed configuration, both the horizontal and vertical aiming 

indicators with be marked with the appropriate aiming settings.  Adjust the 

luminaire until the aiming mark aligns with the aiming bolt.  IF the fixture is 

not pre-aimed from the factory, follow the aiming steps below.  

NOTE:

  The 

vertical aiming bolts are Allen head socket bolts.  The hardware is METRIC 

sizing.  Use of incorrectly sized hardware to tighten these bolts could 

damage the fasteners. 

 

To properly aim the DSF640, the mounting structure shall have mounting 

holes in accordance with the CHM mounting detail.  Contact CHM 

Industries for the drill pattern necessary to support the DSF640.  If 

purchasing mounting structure from CHM, the plates will be factory drilled 

to accommodate the DSF. 

 

AIMING VIA INCLINOMETER  

RECOMMENDED METHOD IN LIEU OF TARGET AIMING 

 

1.

 

The pole and crossarms must be braced so that they are both 

LEVEL (parallel) with the ground. 

2.

 

Each floodlight is attached to the crossarm(s) so that the glass 

lens is LEVEL (parallel) with the ground. 

3.

 

Loosen the (4) aiming bolts (2 per side) and (2) main trunion 

bolts.  

The aiming bolts are M6 and the main trunion bolt is 

M8.  

An inclinometer is positioned on the glass lens 

perpendicular to the crossarm.  The down angle adjustment 

that is indicated in the square boxes of the fixture 

arrangement and aiming schedule is made. The bolts that 

attach the trunnion to floodlight housing are tightened. Match 

mark the location of the aiming bolt (Sharpie permanent 

marker will work here) and the trunion aiming angle so that 

the fixture can be repositioned to the correct location. 

4.

 

The vertical aiming bolts and main trunion bolt are then 

loosened and the floodlight is rotated back to its original 

horizontal (level) position in preparation for Left or Right 

adjustment. Retighten the bolts. 

5.

 

The inclinometer is positioned on the glass lens parallel to the 

crossarm. The crossarm attachment bolts are loosened, the 

Left or Right angle adjustment is made, and the bolt is 

retightened. 

6.

 

Finally, the trunnion/fixture bolts are loosened and the 

floodlight is rotated to its final vertical position (against the 

reposition stop). Make sure that the stop is not bent by rapid 

movement during rotation. Securely tighten all bolts and 

screws. 

 

AIMING VIA AIMING BOLTS 

 

1.

 

Mount the luminaire to the mounting structure. 

2.

 

Loosen the (4) aiming bolts (2 per side) and (2) main trunion 

bolts.  

The aiming bolts are M6 and the main trunion bolt is 

M8.  

Adjust the vertical aiming angle until the aiming bolt align 

with the appropriate down angle as shown on the aiming array 

provided by CHM. 

3.

 

Loosen the main ¾” attachment bolt.  Rotate the fixture left or 

right to the appropriate angle as shown on the aiming array 

provided by CHM.  Once the proper left-right aiming angle has 

been achieved, tighten the main trunion bolt to 80-90 ft*lb of 

torque. 

 

18/3 POWER CABLE FOR 

INCOMING 120V-277V 

POWER 

18/2 POWER CABLE FOR 0-

10VDC CONTROL IF 

NEEDED. 

LED DRIVERS, FACTORY 

WIRED.  

 

The included installation instructions are not to be considered to cover all details.  General best practice and safety precautions should be taken when working with 

electrical equipment such as this.  Should there be any uncertainty about the guidelines contained herein, Carolina High Mast or an Carolina High Mast 

representative should be contacted immediately for further guidance. 

Document Revision 06/10/14 

Reviews: