8
Assembly
Figure 5
Locate bag labeled Figure 5. Locate right
pedal tube assembly. Secure pedal tube
assembly to the handrail assembly with
one M10*81.5 hex bolt and one M10*1.5
hex nut. Please ensure that pedal arm is
aligned in the center of roller wheel while
tightening M10*81.5 bolt (Figure 5a).
Repeat for the left side.
Note:
It is recommended that 2 adults
align and secure the pedal tube assemblies
to the handrail assemblies.
Figure 4
Locate bag labeled Figure 4. Lift and
place left linkage onto shaft sleeve and align
holes. Secure linkage to unit using four
M8*12 mm hex bolts. Repeat for right side.
Note:
The linkage is secured to the sleeve
with three M8*12 hex bolts on the top of
the linkage and one M8*12 hex bolt on the
bottom of the linkage.
Figure 4
Figure 5
M8*12 HEX BOLT
M10*81.5 HEX BOLT
M10*1.5 HEX NUT
SLEEVE
LINKAGE
HANDRAIL ASSEMBLY
PEDAL TUBE ASSEMBLY
Figure 5a
Summary of Contents for E-CZ300
Page 27: ...27 Notes...