CARBONEX ECHO-PG Technical And Operating Manual Download Page 15

E C H O - P G   V E R S I O N   E N 1  

15 

11. Guarantee 

 

The manufacturer, 

CARBONEX Sp. z o.o.

 

ul. Budowlana 19 
41- 100 Siemianowice Śląskie, Poland 

guarantees: 

 

11.1. The highest quality and proper functioning of the device in accordance with the terms 

and conditions given in this manual. 

11.2. Guarantee period: 12 months from the date of purchase. 
11.3.  During  guarantee  period,  all  the  repairs  are  carried  out  free  of  cost,  provided  that  the 

customer shall be responsible for any transportation cost. 

11.4. Guarantee terms and conditions do not apply if the mechanical damages are caused by 

improper use and operation of the device. 

11.5. Sales and after sales service. After sales service and supply of spare parts on payment. 

Any  repair/damage  shall  be  reported  through  phone/fax  no.  +48  32  2030819  or  to 
service department of:  

CARBONEX Sp. z o.o.

 

ul. Budowlana 19 
41- 100 Siemianowice Śląskie, Poland 
e-mail: 

[email protected]

 

web: www.carbonex.com.pl 

 

Summary of Contents for ECHO-PG

Page 1: ...EX Sp z o o ul Budowlana 19 41 100 Siemianowice l skie tel fax 48 32 2030819 www carbonex com pl DEVICE OF WIRELESS SHAFT COMMUNICATION ECHO PG TECHNICAL AND OPERATING MANUAL No DTR 28PG 2014 December...

Page 2: ...g 28PG 01 02 ECHO AK PG Cage device block diagram 28PG 01 03 ECHO AK PG Cage device assembly diagram 28PG 01 04 ECHO AK PG Manipulator EPG outline drawing 28PG 01 05 ECHO AK PG Manipulator EPG assembl...

Page 3: ...EN1 is intended to use in shaft sinking to communicate between crew in platform and hoist operator in mine shaft Whole communication system consists of two sets of components named as the headframe un...

Page 4: ...ncy version D SS 80 Headframe unit consists of MARKING ABBREVIATED MARKING Headframe device ECHO AS PG frequency version A B C D software version EN1 ECHO AS PG A B C D EN1 Microphone unit MNO MNO Lou...

Page 5: ...be two guide ropes or the conveyance must be suspended on at least two ropes does not apply to frequency version D 4 2 There should be electrical connection between headrope and tailrope or between t...

Page 6: ...me unit 128 kHz D from headframe unit to cage unit 160 kHz 5 2 4 Method of sending signals serial 5 2 5 Delay of sending signals 0 1 s 5 2 6 Range of work 1500 m 5 3 Cage unit 5 3 1 Power supply batte...

Page 7: ...SK 48 80 H SK 64 40 H SK 80 40 H 5 5 2 Protection degree IP54 5 5 3 Dimensions 265 x 220 x 90 mm 5 5 4 Weight 4 5 kg 5 6 Coupler SS 5 6 1 Nominal inductance SS 32 178 H SS 48 80 H SS 64 40 H SS 80 40...

Page 8: ...ce inputs should be connected between proper input and common terminal Communication from a platform is realized by a cage device Communication from a bottom is performed by a manipulator EPG drawing...

Page 9: ...will be turned off when red switch BLOCKADE in cage unit would be set into right position there will be a loss of communication between units P5 Button of announcement BA The general purpose button i...

Page 10: ...ice is closed AP authorization for platform yellow led indicates activation the Code of Signals button in cage device lights when input no 7 in headframe device is closed BA button of announcement gen...

Page 11: ...iceable not connected or its inductance is too low LRS lack of a receiving signal yellow led lights when there is proper level of carrier frequency of the receiver 10 bar led indicator indicates the l...

Page 12: ...re is a ferromagnetic core with coil inside housing of device Core and coil are encapsulated by chemical compound There is shown in drawings no 28PG 03 01 7 4 Manipulator EPG Manipulator EPG is shown...

Page 13: ...installation should be performed at least once a year Inductance of coupler SK should be measured in disconnected plug of cage unit During the measurements the headframe unit must be turned off Type...

Page 14: ...onnected to the battery charger 10 List of spare parts 10 1 Cage unit 10 1 1 Cage device ECHO AK PG A or B or C or D EN1 10 1 2 Battery BAKS 9 10 1 3 Manipulator EPG 10 1 4 Coupler SS 32 64 48 80 10 1...

Page 15: ...l the repairs are carried out free of cost provided that the customer shall be responsible for any transportation cost 11 4 Guarantee terms and conditions do not apply if the mechanical damages are ca...

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ......

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Reviews: