CARANDINI SWE Assembly Instructions Download Page 2

WARNING ! 

Connection of lighting fixtures to the electrical installation must be carried out by qualified personnel 
eligible and authorized for such operations.

Before the installation, turn off the main power circuit

Attempts of disassembling or altering fixtures’ internal components are not allowed

Fully operational electrical installation is necessary for the installation of lighting fixtures

9. 

Join   

A   

and   

B    

profiles together [pic. 7] 

10. 

Place the buckle ring (   

A

    profile) on the pin (    

B

    profile) [pic. 8]

11. 

Tighten the clamp by pressing it down; both profiles should be joined now and connected with each other [pic. 9]

12. 

Set the light line horizontally [pic. 10]

13. 

Check all the connections and power connectors

14. 

Connect the light line to the electrical installation by means of power connector of already installed SWE profile [pic. 11] [pic. 12]. 

WARNING !

 - Prior to starting assembly you must turn of the main power. 

Leave the main power turned off after the installation of SWE 

profile.

 

pic. 12 

pic. 11 

pic. 7 

pic. 8 

pic. 9 

Pic. 10 

Reviews: