48
Step 7
In order, fix barbell set(35),back bottom link tube(31),back up link tube(33),front up link tube (32).As the
picture, and choose the corresponding screw group(37,36,34,8) to fasten
1. Put barbell set (35) into barbell sleeve(19) .Fix hexagon socket screw (37) and flat washers (36) at
both end sides.
2. Put back bottom link tube (31) to main frame assembly drawing-right(A)and main frame assembly
drawing-left(B),(as shown in the picture). Fix cylindrical inner hexagon socket screw(34) and flat
washers (8) at both end sides (2 screws on each side).
3. Put back up link tube (33) (The location is shown in the picture), fix cylindrical inner hexagon socket
screw (34) and flat washers (8).
4. Fix front up link tube (32) (The location is shown in the figure) by fastening cylindrical inner hexagon
socket screw (34) and flat washers (8).
Summary of Contents for 10032055
Page 1: ...10032055 Smith Machine ...
Page 6: ...6 Montage Schritt 1 13 9 2 8 10 11 5 4 3 12 14 10 8 7 4 6 1 B 8 8 ...
Page 8: ...8 Schritt 2 6 10 8 16 17 6 8 10 10 8 6 15 6 10 8 8 8 ...
Page 10: ...10 Schritt 3 5 19 18 21 8 20 16 ...
Page 12: ...12 Schritt 4 6 8 23 24 10 22 25 4 11 7 14 9 12 5 10 8 C 8 8 8 4 ...
Page 14: ...14 Schritt 5 8 8 10 6 6 6 8 10 15 6 8 10 16 27 10 8 8 8 6 8 ...
Page 16: ...16 Schritt 6 16 5 8 19 20 21 28 ...
Page 20: ...20 Schritt 8 41 38 39 28 8 10 40 42 31 8 38 ...
Page 24: ...24 Schritt 10 1 56 56 8 8 57 57 27 17 49 49 START START END END Rolle 2 Ende Ende Rolle 1 ...
Page 30: ...30 55 57 62 63 61 Ausschnitt Hersteller CHAL TEC GmbH Wallstr 16 10179 Berlin ...
Page 35: ...35 Installation Step 1 13 9 2 8 10 11 5 4 3 12 14 10 8 7 4 6 1 B 8 8 ...
Page 37: ...37 Step 2 6 10 8 16 17 6 8 10 10 8 6 15 6 10 8 8 8 ...
Page 39: ...39 Step 3 5 19 18 21 8 20 16 ...
Page 41: ...41 Step 4 6 8 23 24 10 22 25 4 11 7 14 9 12 5 10 8 C 8 8 8 4 ...
Page 43: ...43 Step 5 8 8 10 6 6 6 8 10 15 6 8 10 16 27 10 8 8 8 6 8 ...
Page 45: ...45 Step 6 16 5 8 19 20 21 28 ...
Page 47: ...47 Step 7 A B 33 32 35 31 8 36 4 3 3 37 19 19 36 37 34 34 34 34 8 8 8 8 SOCKET HEAD W NP 34 8 ...
Page 49: ...49 Step 8 41 38 39 28 8 10 40 42 31 8 38 ...
Page 53: ...53 Step 10 1 56 56 8 8 57 57 27 17 49 49 START START END END ...
Page 55: ...55 Step 10 2 53 10 8 8 60 59 58 41 62 63 54 Pulley 3 END Pulley 4 START Pulley 5 43 40 ...
Page 60: ...60 Manufacturer CHAL TEC GmbH Wallstr 16 10179 Berlin Germany ...