21
Step 12:
•
Hook a pulley set (
29
) to one of the hooks on the end of the crossing bar (
7
). Run the eyelet end of the cable (
28
)
(3980mm long) through the pulley set (
29
).
•
Run the eyelet end of the cable (
28
) through another pulley set (
29
). Hook the pulley set to the hook on the base
frame (
1
).
•
Attach the cable (
28
) to the bracket on the left force arm (
9
) with a pulley (
23
), a pulley cover (
74
), a button head
bolt M8 x 1,25 x 80 (
57
), a washer M8 (
69
) and a nylock nut M8x1.25 (
67
).
•
Attach the cable (
28
) to the lower upright (
3
) with a pulley (
23
), a cable guide (
27
), a button head bolt M8x1.25x90
(
58
), two wahsers M8 (
69
) and a nylock nut M8 (
67
).
Connect the cable (
28
) to the LAT bar cable (
25
) with the small wuick link (
40
). Repeat the whole procedure for the other
side. Both cables (
28
) are to be connected to the LAT bar cable (
25
).
Note:
Unhooking two of the tension cords
will make the cable assembly easier.
Summary of Contents for 10028963
Page 1: ...10028963 10028964 Hawser ...
Page 3: ...3 Übersicht ...
Page 15: ...15 Overview ...
Page 27: ...27 Aperçu ...