
CANYON FURNITURE COMPANY
6.- TAKE 3 DRW STUDENT LOFT DESK (C) AND 5 DRW STUDENT LOFT CHEST (D), PLACED THEM IN DESIRED POSITION IN THE ROOM,
(PLACE FRONT FACE OF DESK OUTWARDS).
7.- INSERT ONE METAL DOWEL PIN (B) IN EACH OUTSIDE CORNER OF 3 DRW LOFT DESK AND 5 DRW LOFT CHEST, SEE FIG.11
THE BED UNTIL THE METAL DOWEL PIN ARE ALL THE WAY IN THE HOLES OF THE BED, SEE FIG.12
HOOKS ON TOP GUARDRAIL AND SECURE THE LADDER, AS SHOWN IN
CONFIGURATION TYPE # 2
CASTER TWIN BED BOX ( 90-707,90-709 )
J.- (6) 1 1/4" SCREW
1.- ASSEMBLE ROLL AWAY BED, USING ONE HEADBOARD (N), ONE FOOTBOARD (O) AND TWO SIDE RAILS (F).
2.- INSERT TWO CROSS DOWEL NUTS (I) INTO THE SIDE RAIL HOLES, MAKE SURE THE GROOVE IS HORIZONTAL, SEE FIG.1
3.- ATTACH THE HDBD&FTBD INTO THE SIDE RAILS, INSERTING TWO HEX TAP BOLTS ( H) AND TWO WASHERS ( J) INTO THE HDBD&FTBD HOLES, USE THE 5MM ALLEN WRENCH (K) TO
TIGHTEN BOLTS UNTIL SECURE, SEE FIG.2
4.- PLACE FOUR SLATS ( L,Q ) ON SIDE RAIL CLEATS, ONE SLAT IN BOTH HDBD&FTBD ENDS, PUSH THE SLAT AGAINST THE BED END POST ( FIG.A ) AND TWO SLATS IN THE MIDDLE AT
EQUAL DISTANCE FROM THE END SLATS, THEN EACH SLAT END MUST BE FASTEN WITH ONE 1 1/4" SCREW (M), SEE FIG.3
5.- INSERT THE CASTER SOCKETS (P) INTO BOTTOM CORNERS OF THE HEADBOARD&FOOTBOARD, SEE FIG.B
6.- ROLL THE BUNK BED AND PLACE IT BETWEEN 3 DRAWER STUDENT DESK AND LOFT BUNK BED AS SHOWN IN
CONFIGURATION TYPE # 1 AND TYPE # 2
O.- (4) METAL CASTER SOCKET
N.- (1) CASTER BED FOOTBOARD
M.- (1) CASTER BED HEADBOARD
8.- TAKE THE ASSEMBLED
TWIN UPPER BUNK BED,
PLACE IT ON TOP OF BOTH CASES, ALIGNING THE METAL DOWEL PINS WITH EACH PRE- DRILLED HOLE IN EVERY CORNER OF
9.- ALIGN THE PRE - DRILLED HOLES IN LONG PART OF METAL HOOKS BRACKETS (L) WITH THE PRE-DRILLED HOLES IN THE LADDER (K), SECURE WITH 1" SCREWS (M) USING PHILLIP
HEADSCREWDRIVER
( NOT INCLUDED )
, SEE FIG.C AND HOOK THE LADDER IN THE PROPER POSITION, ADJUST AND ALIGN THE PRE-DRILLED HOLES IN THE SHORT PART OF METAL
ROLL AWAY CASTER BED ASSEMBLY INSTRUCTIONS
K.- (1) 3 DRAWER NIGHT STAND
YES,
HORIZONTAL GROOVE
FIG.1
NO
FIG.2
FIG.3
FIG.B
FIG.11
FIG.12
1 1/4 " SCREWS
SIDE RAIL
LADDER METAL HOOKS
LADDER
GUARD RAIL
HEADBOARD&FOOTBOARD
POSITION LADDER
FIG.C
REV 01 14/04/2016
PAGE 4 OF 5
KIS01112