Canyon 28-705 Assembly Instructions Download Page 2

CANYON FURNITURE COMPANY

A.- (1) TOP BUNK BED

B.- (2) 4"METAL DOWEL PINS

C.- (1) LOFT DRESSER

M.- (1) CASTER BED HEADBOARD

D.- (1) LOFT DESK

E.- (1) LOFT HUTCH

J.- (6) 1 1/4" SCREW

B.- (2) 4"METAL DOWEL PINS

F.- (4) SIDE RAILS
G.- (2) GUARD RAILS

H.- (24) 80MM FLAT HEAD BOLTS

I.-  (24) 5/16"-18 X 5/8" CROSS DOWEL NUTS BLACK
J.- (1) 5MM ALLEN WRENCH

K.- (1) HEADBOARD
L.- (1) FOOTBOARD

M.- (4) CASTER SOCKETS

N.- (1) LADDER

Q.- (4) 39'' SLATS

O.- (2) METAL HOOK BRACKETS
P.- (6) 1" SCREWS

R.- (8) 1 1/4" SCREWS

1.- ASSEMBLE TOP BUNK BED, USING TWO TOP BUNK BEDS (A),ONE LOFT DRESSER (C),ONE LOFT DESK (D),TWO LOFT HUTCH (E) TWO SIDE RAILS (F),&TWO GUARDRAILS (G)
2.- TAKE LOFT DRESSER (C) AND LOFT DESK (D), THEN PLACED THEM IN DESIRED POSITION IN THE ROOM, (PLACE FRONT FACE OF DESK OUTWARDS).

3.- INSERT TWO METAL DOWEL PINS (B) ON TOP IN EACH OUTSIDE CORNER OF LOFT DRESSER&LOFT DESK, TAKE THE LOFT HUTCH (E),&PLACE IT ON TOP OF LOFT DRESSER
& LOFT DESK ALIGNING THE METAL DOWEL PIN WITH EACH PRE - DRILLED HOLE IN EVERY END OF THE LOFT HUTCH UNTIL THE METAL DOWEL PIN ARE ALL THE WAY IN THE
HOLE OF THE LOFT HUTCH, REPEAT THE SAME PROCESS WITH TOP BUNK BED (A), 

SEE FIG.9

4.-INSERT 2 CROSS DOWEL NUTS (I) IN ACCESS HOLE INSIDE THE SIDE RAIL&GUARDRAIL,ALIGN THE CROSS DOWEL NUT,MAKE SURE THE GROOVE IS HORIZONTAL,

SEE FIG.10

5.- ATTACH TWO SIDE RAILS & TWO GUARD RAILS TO LOFT DRESSER/HUTCH/TOP BUNK BED ASSEMBLY&LOFT DESK/HUTCH/TOP BUNK BED ASSEMBLY, INSERTING TWO FLAT
HEAD BOLST (H) INTO TOP BUNK BED HOLES, USE THE 5MM ALLEN WRENCH (J) TO TIGHTEN BOTH BOLTS,

(DO NO TIGHTEN COMPLETELY UNTIL ALL PIECES

ARE CONNECTED TOGETHER)

 

SEE FIG.11, 

REPEAT THE SAME PROCESS ON ALL FOUR CORNERS.

6.- PLACE FOUR SLATS (Q) ON TOP SIDE RAIL CLEATS,ONE SLAT IN BOTH ENDS,PUSH THE SLAT AGAINST THE BED END POST 

(FIG.A)

&TWO SLATS IN THE MIDDLE AT EQUAL

DISTANCE FROM THE END SLATS, THEN EACH SLAT MUST BE FASTEN WITH TWO 1 1/4" SCREWS (R), 

SEE FIG.12

N.- (1) CASTER BED FOOTBOARD

LOFT HUTCH BOX (28-766) FIG.4 (2PCS)

HARDWARE PACK  

(HPK00012-0)

6 PIECE RAILS BOX  (28-730) FIG.5

LOFT DESK BOX (28-603) FIG.3

TOP BUNK BED BOX (28-705) FIG.1 (2PCS)

COTTAGE COLORS COLLECTION

LIST OF CONTENTS

TOP BUNK BED ASSEMBLY INSTRUCTIONS  CONFIGURATION TYPE # 1

K.-  (1) 3 DRAWER NIGHT STAND

3 DRAWER NIGHT STAND BOX ( 90-503 )

6 DRAWER LOFT DRESSER BOX (28-207) FIG.2

L.-  (1) DESK TOP

CASTER TWIN BED BOX ( 90-707,90-709 )

O.- (4) METAL CASTER SOCKET

TWIN SLATS BOX (100-645) FIG.8 (2 BOXES)

DESK TOP BOX ( 90-602 )

HARDWARE PACK  

(HPK00123-0)

HARDWARE PACK

 

(HPK00016-0)

TWIN BOTTOM HDBD&FTBD BOX (28-707) FIG.6

HARDWARE PACK

 

(HPK00008-0)

HARDWARE PACK  

(HPK00104-0)

HARDWARE PACK

 

(HPK00127-0)

LADDER BOX (28-720) FIG.7

A

FIG.1 

B

FIG.5 

C

FIG.2 

F

G

I

J

FIG.3 

M

L

K

FIG.6 

FIG.10

YES,

HORIZONTAL GROOVE

FIG.9

FIG.11

FIG.12

NO

D

E

B

FIG.4 

H

HARDWARE PACK

HPK00123-0

HARDWARE PACK

HPK00012-0

HARDWARE PACK

HPK00104-0

HARDWARE PACK

HPK00127-0

N

O

P

HARDWARE PACK

HPK00008-0

FIG.7 

Q

R

HARDWARE PACK

HPK00016-0

FIG.8 

FIG.A

REV 02 04/02/2019

PAGE 2 OF 5

KIS01179-0

Summary of Contents for 28-705

Page 1: ...766 LOFT HUTCH 2 PCS 28 730 6 PIECE RAILS 28 707 TWIN BOTTOM HDBD FTBD 28 720 LADDER 28 735 RAIL CAP 100 645 TWIN SLATS 2 PCS TIPS 2 OPTION 1 28 705 TOP BUNK BED 28 207 6 DRAWER LOFT DRESSER 28 766 LOFT HUTCH 28 706 1 PC BUNK BED END TWIN 28 730 6 PIECE RAILS 28 709 FULL BOTTOM HDBD FTBD 28 720 LADDER 28 735 RAIL CAP 100 645 TWIN SLATS 100 646 FULL SLATS OPTION 1 28 705 TOP BUNK BED 28 603 LOFT DE...

Page 2: ...K BED ASSEMBLY INSERTING TWO FLAT HEAD BOLST H INTO TOP BUNK BED HOLES USE THE 5MM ALLEN WRENCH J TO TIGHTEN BOTH BOLTS DO NO TIGHTEN COMPLETELY UNTIL ALL PIECES ARE CONNECTED TOGETHER SEE FIG 11 REPEAT THE SAME PROCESS ON ALL FOUR CORNERS 6 PLACE FOUR SLATS Q ON TOP SIDE RAIL CLEATS ONE SLAT IN BOTH ENDS PUSH THE SLAT AGAINST THE BED END POST FIG A TWO SLATS IN THE MIDDLE AT EQUAL DISTANCE FROM T...

Page 3: ...WO GUARDRAILS TO DRESSER HUTCH TOP BUNK BED ASSEMBLY 1 PC BUNK BED END TWIN S INSERTING TWO FLAT BOLST H INTO TOP BUNK BED 1 PC BUNK BED END TWIN HOLES USE ALLEN WRENCH TO TIGHTEN BOLTS DO NO TIGHTEN COMPLETELY UNTIL ALL PIECES ARE CONNECTED TOGETHER FIG 11 5 PLACE FOUR SLATS Q ON TOP SIDE RAIL CLEATS ONE SLAT IN BOTH ENDS PUSH THE SLAT AGAINST THE BED END POST FIG A TWO SLATS IN THE MIDDLE AT EQU...

Page 4: ...INTO THE SIDE RAILS INSERTING TWO FLAT HEAD BOLTS H INTO THE HEADBOARD FOOTBOARD HOLES USE THE 5MM ALLEN WRENCH J TO TIGHTEN BOLTS UNTIL SECURE SEE FIG 2 4 PLACE FOUR SLATS Q ON SIDE RAIL CLEATS ONE SLAT IN BOTH ENDS PUSH THE SLAT AGAINST THE BED END POST FIG A AND TWO SLATS IN THE MIDDLE AT EQUAL DISTANCE FROM THE END SLATS THEN EACH SLAT MUST BE FASTEN WITH TWO 1 1 4 SCREWS R SEE FIG 3 5 INSERT ...

Page 5: ...INST THE WALL TO PREVENT ENTRAPMENT BETWEEN THE BED AND THE WALL 12 ALWAYS USE GUARDRAILS ON BOTH LONG SIDES OF THE UPPER BUNK 13 THE USE OF WATER OR SLEEP FLOTATION MATTRESSES IS PROHIBITED 14 STRANGULATION HAZARD NEVER ATTACH OR HANG ITEMS TO ANY PART OF THE BUNK BED THAT ARE NOT DESIGNED FOR USE WITH THE BED FOR EXAMPLE BUT NOT LIMITED TO HOOKS BELTS AND JUMP ROPES 15 KEEP THESE INSTRUCTIONS FO...

Reviews: