![Canvas SKYLINE 088-2258-8 Manual Download Page 35](http://html.mh-extra.com/html/canvas/skyline-088-2258-8/skyline-088-2258-8_manual_493718035.webp)
STEP 22
31
X4
29
X1
4&5
Zipper
Zipper
Zipper
Zipper
118 1/4" (3 m)
118 1/4" (3 m)
59 1/8" (150 cm)
59 1/8" (150 cm)
29
29
31
Magnet
Connection
Here
29
Wall
Curtain
Netting
35
SKYLINE 10' x 10' SINGLE-TIER GAZEBO
TIP:
There are five (5) grommets on the each side.
Start hanging the netting by working your
way from to right, starting at the corners.
TIP:
If you skipped steps 11 & 12 earlier, move your
gazebo into its finial position now. Repeat the
frame squaring procedure from step 9 after
moving the gazebo and then complete steps
12 & 13 before performing step 22.
NOTE:
Insert magnet (part 31)
into the magnet pocket on
the back of the curtain.