38
STEP-BY-STEP GUIDE
STEP-BY-STEP GUIDE
SKYLINE 10'X12' DOUBLE-TIER GAZEBO
STEP 24
16
17
17
16
B
17
16
6
B
X8
17
X4
16
X4
NOTE:
Install all bolts by hand loosely
threaded BEFORE fully tightening
any bolts. Once all bolts are installed
loosely, then secure the bolts before
moving on to the next step.
TIP:
Make sure holes at bottom
of panels align before
tightening bolts fully.
38
STEP-BY-STEP GUIDE
STEP-BY-STEP GUIDE
SKYLINE 10'X12' DOUBLE-TIER GAZEBO
STEP 24
16
17
17
16
B
17
16
6
B
X8
17
X4
16
X4
NOTE:
Install all bolts by hand loosely
threaded BEFORE fully tightening
any bolts. Once all bolts are installed
loosely, then secure the bolts before
moving on to the next step.
TIP:
Make sure holes at bottom
of panels align before
tightening bolts fully.