INSTALLATION GUIDE

canusacps.com

Flame Intensity & 

Torch Size

Epoxy Primer

Pre-Heat

Surface Preparation

Epoxy Primer Application

Sleeve Installation

GTS-80/T

4

8

12

Ensure that the mainline coating edges 
are beveled to 30°. If there is the pres-
ence of oil, grease, or other surface 
contaminants; clean the exposed steel 
and adjacent pipe coating with a solvent 
cleanser.

Apply mixed epoxy to a minimum uni-
form thickness of 4 mils on all exposed 
bare metal plus 10 mm (0.5”) onto the 
adjacent pipe coating.

Centre the sleeve over the joint so that 
the sleeve overlaps between the 10 and 
2 o’clock positions. Press the underlap 
fi rmly into place. Remove the remaining 
release liner.

7

11

Follow the Preparation, Mixing and 
Application instructions provided with 
the supplied Canusa Epoxy Pack. For 
bulk quantities: mix the primer cure with 
the primer base (4 parts base to 1 part 
cure by volume). Stir for a minimum of 30 
seconds to assure uniform mixture.

Partially remove the release liner and 
gently heat the underlap approximately 
150 mm (6”) from the edge.

Global Transmission Sleeve

Canusa torch, propane tank, hose & 
regulator; Canusa E-Primer, thickness 
gauge Mixing sticks, cups & applicator 
pads; Digital Thermometer with suit-
able probe, fl at  roller;  Appropriate  tools 
for abrasion (rasp, fi le, or sandpaper); 
Standard safety equipment (gloves, gog-
gles, hard hat, etc.)

Wipe clean or air blast the steel and 
coated areas to remove foreign materials.

Ensure that the epoxy primer is dry to 
the touch prior to sleeve installation.

Equipment List

2

6

10

1

5

9

GTS-80 Global Transmission Sleeves are 
shipped pre-cut with a pre-attached clo-
sure. Bulk quantities are also available. 
The adhesive is protected from contami-
nation by an inner liner.

Warm the joint area to 40-50°C (100-
120°F) before grit blasting. Thoroughly 
clean the weld area with a sand or grit 
blaster to “near white metal” SIS Sa 
2½ or equivalent. Abrade the mainline 
coating adjacent to the weld area to a 
distance 50 mm (2”) beyond the sleeve 
width.

Preheat the epoxy to a temperature of 
110°C and the abraded mainline coat-
ing to be covered by the sleeve to a 
minimum of 100°C with the appropriate 
propane torch, induction heating or infra-
red heating equipment. 

Do not use an 

intense fl ame on the mainline coating.

 If 

a fi lm develops on the mainline coating 
because of preheat, use a surface abra-
sion tool to remove it.

Product Description

Pipe O.D.

≤ 450mm 

   (18”)     

Minimum Torch Size:
150,000 BTU/hr. 

Minimum Torch Size:
300,000 BTU/hr. 

Use 

moderate to high

 

fl ame intensity for pre-
heating and shrinking.

Use 

moderate

 

fl ame intensity for pre-
heating and shrinking.

Pipe O.D.

> 450mm 

   (18”)     

3

Mainline Coating

100°C (212°F)

110°C (230°F)

g

)

)

SIS Sa 2½

SSPC SP 10

Slee

ve

 Width

50 mm + Slee

ve

 + 50 mm

Cure

Base

Base

Epoxy CB

Epoxy BP

Cure

Epoxy

Cure

Base