Chapter 4
4-13
F-4-52
3) Move the grip [1] as the direction of the arrow, and open the saddle stack
guide assembly [2].
F-4-53
4) Remove the cable cover [1].
- 2 screws [2]
F-4-54
5) Remove the saddle staple unit [1].
- 1 connector [2]
- 2 screws [3]
F-4-55
4.3.7 Front Alignment Motor
4.3.7.1 Preparation for Removing the Front Alignment
Motor
0020-8359
1) Remove the stack wall (upper).
Reference[Removing the
Stack Wall (Upper)]
2) Remove the stack wall (lower).
Reference[Removing the
Stack Wall (Lower)]
3) Remove the process tray assembly.
Reference[Removing
the Process Tray Assembly]
4.3.7.2 Removing the Front Alignment Motor
0020-8360
1) Remove the cable [2] from the 3 wire saddles [1], and remove the connec-
tor [3].
F-4-56
2) Remove the cable [2] from the 2 wire saddles [1], and remove the connec-
tor [3].
[1]
[1]
[2]
[1]
[2]
[1]
[2]
[3]
[3]
[2]
[1]
Summary of Contents for Saddle Finisher-AF2
Page 1: ...SERVICE MANUAL Saddle Finisher AF2 MARCH 6 2009...
Page 2: ......
Page 6: ......
Page 12: ...Contents...
Page 13: ...Chapter 1 Specifications...
Page 14: ......
Page 16: ......
Page 22: ......
Page 23: ...Chapter 2 Installation...
Page 24: ......
Page 26: ......
Page 55: ...Chapter 3 Functions...
Page 56: ......
Page 58: ......
Page 104: ...Chapter 3 3 46...
Page 105: ...Chapter 4 Parts Replacement Procedure...
Page 106: ......
Page 110: ......
Page 157: ...Chapter 4 4 47 F 4 213 3 2 1...
Page 158: ......
Page 159: ...Chapter 5 Maintenance...
Page 160: ......
Page 209: ...Chapter 5 5 47 F 5 221 SW382 SW381 SW383 ENTER SW384 SW385 DSP381 1...
Page 218: ......
Page 219: ...Appendix...
Page 220: ......
Page 221: ...General Timing Chart General Circuit Diagram Finisher Sorter DeliveryTray Saddle Finisher AF2...
Page 222: ......
Page 224: ......
Page 225: ...Contents 1 General Circuit Diagram 1 Signal Names 1 General Circuit Diagram 9...
Page 226: ......
Page 243: ......
Page 244: ......