imageRUNNER ADVANCE 8500 and 8500 II Series Customer Expectations Document
Version 7 imageRUNNER ADVANCE 8500 and 8500 II Series Customer Expectations Document
Page 88
8. Installation Review
This chapter describes the necessary number of technicians required to install the
machine properly, the time required to install the main unit and optional equipment,
and customer installation responsibilities.
8.1 Installation Time
The time required to install the imageRUNNER ADVANCE 8500 and 8500 II Series,
depends on the options and accessories to be installed, and the number of
technicians performing the installation. Customers should discuss the time
requirements with their servicing dealer and schedule the installation accordingly.
The table below indicates the estimated length of time needed to unpack and
install the machine and optional accessories. The estimated installation time is
based on a minimum of one (1) experienced technician.
Item
Estimated Time
imageRUNNER ADVANCE 8505i/8505i II and 8595i/8595i II with the
Upright Control Panel
35 minutes
imageRUNNER ADVANCE 8585i/8585i II with the Flat Control Panel
34 minutes
Platen Cover-H1
12 minutes
Upright Control Panel
29 minutes
Paper Deck Unit-E1
9 minutes
POD Deck Lite-C1
12 minutes
Staple Finisher-V1
13 minutes
Booklet Finisher-V1
18 minutes
Booklet Finisher-W1 PRO
18 minutes
Staple Finisher-W1 PRO
17 minutes
Staple Finisher-X1
14 minutes
Booklet Finisher-X1
17 minutes
2/3 Hole Puncher Unit-A1
8 minutes
Puncher Unit-BF1
13 minutes
Puncher Unit-BS1
17 minutes
56 Requires the removal of the standard Single-Pass Duplexing ADF and Reader.