How to Check the Installation Procedure
Symbols
The frequently-performed operations are described with symbols in this procedure.
1x
1x
1x
Install
Screw
Packaged Item
Remove
Tighten
Loosen
1x
Connect
Connector
Disconnect
Install
Harness
(Common for Guides
and Clamps)
Remove
1x
1x
Connect
Power Cord
Disconnect
Check visually
Check the sound
Check
OFF
Cleaning
ON
Push
Power
Unused Parts
1x
1x
6. Installation
45
Summary of Contents for Cassette Feeding Unit-AM1
Page 6: ...Safety Precautions Points to Note Before Servicing 2 Handling of packaging materials 2 ...
Page 8: ...Product Overview 1 Specifications 4 Parts Name 5 ...
Page 21: ...Periodical Service 3 Cassette Feeding Unit AM1 17 ...
Page 23: ...Parts Replacement and Cleaning 4 List of Parts 19 Parts Replacement Procedure 23 ...
Page 46: ...1x 5 Adjustment 41 ...
Page 52: ...2 3 6 Installation 47 ...
Page 53: ...4 5 6 Installation 48 ...
Page 55: ...7 NOTE Remove all the tapes and packaging materials from the cassette 8 6 Installation 50 ...
Page 60: ...5 6 1x NOTE The removed screw will be used in step 10 6 Installation 55 ...
Page 61: ...7 Old Type 5 Cables 5x New Type 4 Cables 4x 6 Installation 56 ...
Page 62: ...8 Old Type 5 Cables 11x New Type 4 Cables 11x 9 1x 1x 6 Installation 57 ...
Page 63: ...10 NOTE Use the screws removed in step 6 1x 11 6 Installation 58 ...