5
5
5-3
5-3
Installation > Unpacking the Equipment
Installation > Unpacking the Equipment
Check Items when Turning OFF the Main Power
Check that the main power is OFF.
1) Turning off the Main Power Supply Switch of the Host Machine.
2) Check that the display on the Control Panel and the Main Power Supply Lamp are turned
off before disconnecting the outlet.
Installation Outline Drawing
F-5-4
Unpacking the Equipment
1) Remove the container box.
CAUTION:
To prevent a fall, be sure not to lift this equipment while it is still in the plastic bag.
2) Open the plastic, remove the 2 pads and a piece of Cardboard by lifting rear of the
equipment, and move the plastic toward the pads at front.
Plastic
Pad
Pad
Cardboard
F-5-5
F-5-6
Summary of Contents for AD2
Page 4: ...Safety Precautions Notes Before it Works Serving ...
Page 6: ...1 1 Specifications Specifications Specifications Names of Parts ...
Page 8: ...2 2 Technology Technology Basic Configuration Pickup Feed System JAM Detection Power supply ...
Page 26: ...4 4 Maintenance Maintenance Periodical maintenance Adjustment Parts Configuration Role ...