76
TE-BBR Instruction and Operation Manual
Caution:
The TE-BBR is heavy. Obtain assistance for this procedure. Use
appropriate safety precautions when lifting.
All panels are connected to the TE-BBR components by wiring. Do not
disconnect wiring. Avoid contact with internal electrical components during the
procedure.
3.
Remove the four Phillips screws securing the bottom motor mounting plate to the TE-BBR frame.
4.
Cut the two wires to the motor stirrer and remove the motor and plate. Refer to
5.
Slide the wires from the new motor stirrer through the grommet.
6.
Ensure that the wires have been inserted through the grommet (step 6). Then attach the wires to #1
and #2 on the new connector. Refer to Figure 33.
Figure 33: Motor Stirrer Wiring Diagram
7.
Orient the bottom plate in its original position on the bath and reattach the new connector to the
AC power connection with the flathead screws previously removed. Be careful not to pinch the wires
between TE-BBR components as this can damage the wire insulation.
8.
Reattach the front and rear panels using the screws previously removed.
9.
Return the instrument to its upright position and replace the bath stirrer, stirrer grid, bath liquid,
Load Frame and bath cover. The motor stirrer installation is complete.
Please contact CANNON for a return authorization (RA) to return the old motor and plate assembly.
Summary of Contents for TE-BBR
Page 1: ...Instruction Operation Manual 44 0991 Thermo Electric Bending Beam Rheometer TE BBR ...
Page 2: ......
Page 10: ......
Page 11: ......
Page 44: ...CANNON Instrument Company Software Menu Options 33 Figure 17 Toolbar Options ...
Page 47: ...36 TE BBR Instruction and Operation Manual Figure 18 Mold Specimen Diagram ...
Page 70: ...CANNON Instrument Company Troubleshooting 59 Figure 25 Diagram A new Figure 26 Diagram B old ...
Page 85: ...74 TE BBR Instruction and Operation Manual Figure 31 Graph View ...