Front Mount
The Front Mount Dual Rod Holder fits over the lower
end of the Cannon Downrigger Telescopic and Standard
24” Tube Steel Booms.
Attaching the Front Mount Dual Rod Holder:
1) Loosen the Boom Locking Screw and remove the Boom.
2) Slip the Bracket over the Boom on the end that assembles to the downrigger.
3) Attach the Boom the downrigger and retighten the Locking Screw to fix the
Boom in place.
4) Position the Bracket per preference. To lock the bracket in place, tighten the
two Set Screws in the Bracket to the Boom.
5) Refer to Figure 1 below and assemble the Rod Holders making sure that the
Lock Washers are between the Bracket and the Rod Holder Clamp.
FIGURE 1
Downrigger
Frame
Rod Holder
Bracket
Boom
Rod Holder
Clamp
Tools You Will Need:
•
7/16” Wrench
•
7/16” Socket Wrench
•
3/16” Allen Wrench
•
Phillips Screw Driver
Set Screw
Bolt Lock Washer Nut
NOTE: Star Washer
goes between clamp
and bracket
.
Montage arrière
Le double porte-canne à montage arrière est prévu pour le collier de porte-canne standard
à l’arrière du downrigger Cannon.
Fixer le double porte-canne à montage arrière :
1) S’il est fixé, desserrez la quincaillerie du collier de porte-canne à l’arrière du châssis du
downrigger.
2) S’il est en place, enlevez le tube du porte-canne et remplacez-le par le poteau de
montage arrière.
3) Fixez le support sur le poteau de montage arrière.
4) Positionnez le support selon vos préférences. Pour bloquer le support en place, serrez
les deux vis de blocage dans le support contre le poteau de montage arrière.
5) Reportez-vous à la figure 2 ci-dessous et assemblez les porte-cannes en vous assurant
que les rondelles de sûreté se trouvent entre le support et le collier de porte-canne.
FIGURE 2
Châssis du
downrigger
Porte-canne
Support
Collier de porte-
canne standard
Collier de
porte-canne
Vis de blocage
Rondelle de
sûreté
Boulon
Écrou
NOTE: Star Washer va
entre support et pince.