
Page 9
4.6
STILL WEARING GLOVES; wipe gently over rubbed down section with a piece of cotton cloth, you
may still feel a slight pick up on the cloth but there should not be any evidence of splinters left; if there are
repeat the rubbing down process with sand paper until these are removed.
4.7
Slide the Thimble and Plastic Bushes back into place, ensure all bushes are correctly orientated
(Orientation highlighted on exploded diagram on page 1).
4.8
Replace the End Stop. To do this tighten by hand and then insert a small screw driver (or suitable tool)
through the cross holes & lock up as tight as possible. (see Fig. 18)
NOTE: We recommend using a pin point drop of Loctite 222 on the last thread of the End Stop during
re-assembly, this stops it accidentally undoing during normal usage.
4.9
Wipe a small amount of silicon fluid over section and slide into mating section. Put a small amount of
lithium grease on the Thread End of section and screw together with Thimble on mating section.
4.10
If sliding action of boom is too stiff or too loose End Stop adjustment maybe required, please follow
the instructions in section 3.0
If your boom has suffered irreparable damage and the steps above are not rectifying the problem; the best
course of action is to contact Canford Audio Plc and ask us about a replacement section.
end stop
Fig.18
Summary of Contents for Panamic Series
Page 11: ...Page 10 NOTES...