background image

EBAC

To change the setting of any of these above shown parameters, User can select the desired one by Pressing    
  
          key. Already set value will be displayed. Press 

to edit the setting. The value will start flashing. 

Then use 

keys to change the value and then press          key to save the changed value. 

Press 

key -->                 and than press               to exit that particular parameter editing.

Short Press

Short Press

Short Press

Short Press

Scroll Keys

Press               key to test relay contacts in a sequence

Press               to exit the Relay Contact Test.

Note: Contact Test will be blocked          when load is connected.

C

Relay Contact Test

Test Menu

-tt-

Short Press

Sub menu screens for B/C

Press             to see the below shown screen.

B

YES

AvTo

CA

Short Press

CA

Note: C/k ratio will not be calculated properly or can be miscalculated when load is unstable and varies quickly, 
This may cause improper compensation. The better option is to disconnect the load and then start this process. 
C/k will be calculated and stored in the memory. The calculated value can be viewed in C/k ratio setting (    ) under 
programmable parameters.

In Auto C/k setup C/k value will be calculated based on first capacitor step rating. This capacitor is the smallest 
size among the all capacitor steps connected.

12

Summary of Contents for CSPF-100

Page 1: ...is the same as the one ordered For the safe use of CSPF 100 it is vital that those persons installing or handling it follow the usual safety procedures as well as specific warnings contained in the Q...

Page 2: ...nder compensation over voltage over under current etc u FAN control output over temp alarm based on a built in temp sensing u Field accessible test mode for relay contact check u Automatic C K set up...

Page 3: ...11 12 1 2 3 4 5 6 7 8 K M CSPF 100 ONTROLLER C ACTOR F OWER P AUTO MANUAL ON Manual OFF Auto Operation mode Auto Manual Cos indication Voltage indication Current indication Active Power indication Re...

Page 4: ...6 Steps 8 Steps 12 Steps CSPF 100 R06 220 CSPF 100 R08 220 CSPF 100 R12 220 04...

Page 5: ...Panel cut out 138 0 138 0 Back view of CSPF All the dim are in mm Gen Tol 1 0mm Front View Side View 144 0 144 0 Dimension Details Mounting Clamp Clamp fixing screw 69 0 80 0 63 0 137 0 05...

Page 6: ...sure that correct discharge resistors are fitted to capacitor bank terminals for safety reason They are required for discharging capacitor voltage 1 2 10 3 6 5 7 8 9 11 12 21 22 23 24 25 26 27 AUX SUP...

Page 7: ...2 24 K3 N O Contact for Cap Bank 3 25 K4 N O Contact for Cap Bank 4 26 K5 N O Contact for Cap Bank 5 27 K6 N O Contact for Cap Bank 6 28 COMM Common Terminal for Relay contact K7 K12 29 K7 N O Contac...

Page 8: ...nnection scheme 2 Model Dependent 2 Refer C K Ratio section to set proper value 3 Switching program determines the power kVAr ratio sequence of the capacitor Bank steps connected A Common Parameters A...

Page 9: ...1 In OFF Under current Alarm delay DELY 1 999 1 Sec 5 2 Capacitor Bank Trip selection on Under current CAP OFF ON OFF 1 Over compensation oCo 1 600 1 Sec 5 1 Under compensation vCo 1 600 1 Sec 5 1 0 T...

Page 10: ...ill be edited or viewed going through different screens using keys Below are the brief overview of the menu structure AUTO Manual mode will be indicated by Auto Manual LED Use keys to scroll view the...

Page 11: ...nt trip Cap Bank ON OFF selection for High Temp trip oURU Over Voltage setting DELY CAP Return to Prev Menu DELY Temp High Trip Delay DELY Over current Delay Under current Delay Over voltage Delay DEL...

Page 12: ...ntact Test will be blocked when load is connected C Relay Contact Test Test Menu tt Short Press Sub menu screens for B C Press to see the below shown screen B YES AvTo CA Short Press CA Note C k ratio...

Page 13: ...Circuit Target Cos setting 0 80 Lag 1 00 0 8 Lead CT Ratio Configurable Max 9999 Compliance Standard IEC 61000 0 0 Operating Temperature Range 0 C to 55 C 0 0 Storage Temperature Range 10 C to 70 C Hu...

Page 14: ...7 0 83 1 00 200 5 40 0 06 0 13 0 25 0 31 0 38 0 50 0 63 0 75 1 00 300 5 60 0 04 0 08 0 17 0 21 0 25 0 33 0 42 0 50 0 67 0 83 1 00 400 5 80 0 03 0 06 0 13 0 16 0 19 0 25 0 31 0 38 0 50 0 63 0 75 500 5...

Page 15: ...5 6 L1 L2 L3 N S1 S2 AUX SUPPLY FUSE P N 11 12 1 2 0 PHASE ANGLE 60 AnEL CURRENT VOLTAGE Vin 5 6 L1 L2 L3 N AUX SUPPLY FUSE P N S1 S2 0 PHASE ANGLE 120 AnEL CURRENT VOLTAGE Vin 5 6 L1 L2 L3 N S1 S2 1...

Page 16: ...ction to be taken Over Compensation Alarm Under Compensation Alarm Target Cos phi is within limit Conn scheme is not as per phase angle set All the capacitor steps were switched On But target cos phi...

Reviews: