background image

FUNCTIONING

COMPONENTS LOCATION

Control panel

C

23

22

18

21

20

17

15

3

49

12

40

11

39

36

29

26

51

24

50

46

10

33

45

35

13

34

14

25

K

BRITONY System II plus
FUNCTIONAL DIAGRAM

Heating mode

50

47

45

51

49

43

42

40

39

37

36

35

29

32

30

31

28

27

24

14

13

12

1

3

2

5

7

storage

tank

Switching on
1) Check that the gas service tap is opened at the gasmeter and main

power is on.

2) Check that pressure in central heating system is above 0.7 bar and

below 2.5 bar with the pressure gauge 

18.

3) Open the gas tap 

by turning from right to left.

4) The boiler is now ready to use.

Hot Water

1

) Turn selector switch 15 to position 

The green "power on" indi-

cator 

(20) will light.

2) The orange "burner on" indicator 

(21) will light and the cylinder-

will be heated.

Heating and Hot Water

1) Turn selector switch 15 to position 

. The green "power on"

indicator will 

light.(20)

2) If the room thermostat (if fitted), the boiler temperature control 

and the clock (if fitted) are all calling for heat, the orange "burner

on" indicator 

will light and the heating will be on.

Summary of Contents for Britony System II Plus 80

Page 1: ...er kW power kW power kW Natural gas G 20 at 20 mbar 2 74 m3 h 1 22 m3 h 3 34 m3 h 1 57 m3 h Butane gas G 30 at 28 mbar 2 04 kg h 0 91 kg h 2 45 kg h 1 17 kg h Propane gas G 31 at 37 mbar 2 00 kg h 0 8...

Page 2: ...sition selector switch 17 Heating flow temperature adjustment 18 CH pressure gauge 20 Green indicator Power ON 21 Orange indicator Burner ON 22 Red indicator Lock out flame failure 23 Reset button 24...

Page 3: ...system is above 0 7 bar and below 2 5 bar with the pressure gauge 18 3 Open the gas tap 3 by turning from right to left 4 The boiler is now ready to use Hot Water 1 Turn selector switch 15 to position...

Page 4: ...s If the boiler tem perature control is calling for heat and primary flow rate over 4 ltr min the cen tral heating flow switch operates allowing the ignition sequence to begin The first stage solenoid...

Page 5: ...s controls Check the functions of the safety con trols Check combustion chamber insulation panels for damage Clean the burner Clean the heat exchanger Check the burner manifold injectors Clean gas and...

Page 6: ...verse order 7 Gas Solenoids Disconnect colour coded leads Remove six screws The solenoids are attached to their base plate Lift clear taking care not to lose the three plungers and springs Reassemble...

Page 7: ...first undo the retaining screw and pull out the valve Reassemble in reverse order 20 Thermistor Drain the boiler as step 12 Disconnect the plug remove the retaining clip pull the thermistor out Reass...

Page 8: ...ESET button Replace control PCB or driver PCB Ok No Yes No Yes Does the pump run Does the fan run Replace heating flow switch Replace heating thermistor Replace pressure switch Check or replace main h...

Page 9: ...ipe temperature rise Does the orange LED light Yes Yes Does the orange LED light No No Yes Yes Does the burner light for more than 8 sec Check if an overheat occur or replace overheat sensor Press the...

Page 10: ...000733 514 SHUNT PLATE 1010611 532 WATER THROTTLE 277846 81471 547 GAS FILTER 263545 37309 560 AIR SEPARATOR HEAD ASSEMBLY 277857 1002653 572 PUMP UP 15 50 230V E11662 1010612 605 CONNECTOR 277872 101...

Page 11: ...Notes 11...

Page 12: ...ed in this document Manufacturer Chaffoteaux Maury France Commercial subsidiary MTS GB Limited MTS Building Hughenden Avenue High Wycombe Bucks HP13 5FT Telephone 01494 755600 Fax 01494 459775 Interne...

Reviews: