background image

 

 

N O T E S :

 

C&H Technologies, Inc. <> 445 Round Rock West Drive <> Round Rock, TX 78681 <> www.chtech.com

Summary of Contents for Active Module Carrier VX402C-64

Page 1: ...Document Part No 11028504B MO D E L V X4 0 2 C 6 4 U S E R S M A N U A L AC TIV E MO D U L E C AR R IE R C H Technologies Inc 445 Round Rock West Drive Round Rock TX 78681 www chtech com...

Page 2: ...echnologies Inc The information and or drawings set forth in this document and all rights in and to inventions disclosed herein which might be granted thereon disclosing or employing the materials met...

Page 3: ...e and manual Manual updates may also be found on out web site at www chtech com NOTE The contents of any amendment may affect operation maintenance or calibration of the equipment REVISION HISTORY Rev...

Page 4: ...ysical and electrical specifications installation and startup procedures functional description and configuration guidelines to adequately use the product The part numbers covered by this manual are P...

Page 5: ...3 INSTALLATION 11 2 4 PREPARATION FOR RESHIPMENT 11 3 0 FUNCTIONAL DESCRIPTION 13 3 1 GENERAL 13 3 2 TRIGGERS 14 3 2 1 TTL TRIGGERS 14 3 2 2 ECL TRIGGERS 15 3 3 CONNECTORS 15 3 3 1 VXI REAR Connectors...

Page 6: ...s 9 Figure 5 Functional Block Diagram 13 Figure 6 TTL Trigger Direction 14 Figure 7 ECL Trigger Direction 15 Figure 8 Pass Through Connector Location 16 Figure 9 SUMBUS Custom Area 18 Figure 10 SUMBUS...

Page 7: ...l of the VME module sits flush with the front panels of other C size modules as shown in Figure 1 The VX402C 64 supports interrupts and provides a capability for bringing P2 VME signals to the front p...

Page 8: ...0002 version does not provide 3 3V power A simplified power schematic for each version is shown in Figure 2 Figure 3 and Figure 4 Excluding the 3 3V supply the VX402C 64 only requires 300mA of 5V pow...

Page 9: ...BACKPLANE 5V 5V VME64 CONNECTORS GND GND 7 PINS 7 PINS INTERNAL LOGIC VXI BACKPLANE 5V 3 3V 5V VME64 CONNECTORS GND GND 7 PINS 7 PINS 10 PINS 24V or 24V 1 PIN INTERNAL LOGIC ISOLATED DC DC CONVERTER O...

Page 10: ...specification for the height and width of Size C modules The nominal dimensions are 233 35 mm 9 187 in high x 156 337 mm 6 155 in deep Once the VX402C 64 is adapted to a VME module the total dimension...

Page 11: ...configure the switches and jumpers Replace the shield and insert the carrier into the appropriate slot according to the desired priority Insert the VME module through the front panel of the VX402C 64...

Page 12: ...12 C H Technologies Inc 445 Round Rock West Drive Round Rock TX 78681 www chtech com...

Page 13: ...which meet all VME specifications to the VME module A functional block diagram is shown in Figure 5 Figure 5 Functional Block Diagram P1 P2 J1 J2 Pass Through Connectors Trigger Buffer Interrupt Buffe...

Page 14: ...402C 64 to the front panel TTLTRG0 7 Each trigger line may be set as an input or output trigger The trigger direction is set using switch S1 which can be seen in Figure 6 The directions are also clear...

Page 15: ...ctors The P1 and P2 connectors are configured in accordance with the VXI specification and utilize the ECL and TTL trigger lines Pinout details for the rear connectors can be found in Appendix A 3 3 2...

Page 16: ...ignals on the P2 connector of the backplane Only use this cable for modules which utilize the outer rows on the J2 connector and completely adhere to the VXI specification If the VME module has no out...

Page 17: ...A11 LBUSA10 5 2V LBUSA09 21 23 25 27 29 C22 C21 C20 C19 C18 USER DEF USER DEF USER DEF USER DEF USER DEF 22 24 26 28 30 A22 A21 A20 A19 A18 USER DEF USER DEF USER DEF USER DEF USER DEF 31 33 35 37 39...

Page 18: ...12V supplies and two jumpers for configuring the signal The prototyping area is a 10x10 grid of 0 1 spaced through hole pads which can be used in any way desired The SUMBUS signal can be wired to the...

Page 19: ...gh the prototyping area B or disconnected C The pass through connector must be installed for the SUMBUS signal to route to the front panel Also both jumpers must be configured the same or the SUMBUS s...

Page 20: ...20 C H Technologies Inc 445 Round Rock West Drive Round Rock TX 78681 www chtech com...

Page 21: ...hen set the necessary trigger directions using the switches Ensure the jumpers are set for proper SUMBUS signal routing Install or remove the pass through connector cable as desired and replace the sh...

Page 22: ...22 C H Technologies Inc 445 Round Rock West Drive Round Rock TX 78681 www chtech com...

Page 23: ...UT3 GND DS1 DS0 WRITE GND 16 17 18 19 20 A22 A21 A20 A19 A18 AM0 AM1 AM2 AM3 GND DTACK GND AS GND IACK 21 22 23 24 25 A17 A16 A15 A14 A13 GND IRQ7 IRQ6 IACKIN IACKOUT AM4 A07 A06 26 27 28 29 30 A12 A1...

Page 24: ...A04 LBUSA05 5 2V LBUSA06 LBUSA07 16 17 18 19 20 GND LBUSC08 LBUSC09 5 2V LBUSC10 D18 D19 D20 D21 D22 GND LBUSA08 LBUSA09 5 2V LBUSA10 21 22 23 24 25 LBUSC11 GND TTLTRG1 TTLTRG3 GND D23 GND D24 D25 D26...

Page 25: ...BA21 BA20 BA19 BA18 BAM0 BAM1 BAM2 BAM3 GND BDTACK GND BAS GND BIACK GND GND GND 21 22 23 24 25 3 3V 3 3V BA17 BA16 BA15 BA14 BA13 GND BIRQ7 BIRQ6 BIACKIN BIACKOUT BAM4 BA07 BA06 GND GND 26 27 28 29...

Page 26: ...5 2V1 LBUSC10n BD18 BD19 BD20 BD21 BD22 GND09 LBUSA08n LBUSA09n 5 2V2 LBUSA10n GND GND GND 21 22 23 24 25 LBUSC11n GND06 BTTLTRG1 BTTLTRG3 GND05 BD23 GND BD24 BD25 BD26 LBUSA11n GND07 BTTLTRG0 BTTLTR...

Page 27: ...A11 LBUSA10 5 2V LBUSA09 31 33 35 37 39 LBUSC08n GND08 LBUSC07n LBUSC06n 2V1 32 34 36 38 40 LBUSA08n GND09 LBUSA07n LBUSA06n 5 2V3 31 33 35 37 39 LBUSC08 GND LBUSC07 LBUSC06 2V 32 34 36 38 40 LBUSA08...

Page 28: ...A 6 C H Technologies Inc 445 Round Rock West Drive Round Rock TX 78681 www chtech com...

Page 29: ...N O T E S C H Technologies Inc 445 Round Rock West Drive Round Rock TX 78681 www chtech com...

Page 30: ...C H Technologies Inc 445 Round Rock West Drive Round Rock TX 78681 www chtech com...

Page 31: ...tsoever You may of course continue to use the information which you supply Please refrain from using this form for technical questions or for requests for additional publications this will only delay...

Page 32: ...ether or not your comments were being incorporated NOTE This form may not be used to request copies of documents or to request waivers deviations or clarification of specification requirements on curr...

Reviews: