
Canarm Hexa-Lite 6LEC Series - 10’-24’ Models
15
6
MOUNTING METHOD 2: ANGLE IRONS
6.5 Attach Upper Yoke (to Angle Iron):
Secure the upper yoke directly to the angle irons with the Beam Clamp hardware as depicted below.
Consult the diagrams below for distances between the angle irons. Do not install the fan from a single
purlin, truss, or bar joist.
Tighten bolts to 90 ft-lb (122 N-m) using a 3/4” socket and torque wrench.
Beam Clamp Hardware (supplied):
a.
(4) 1/2”-13x2-1/2” GR 5 Bolt
b.
(8) 1/2” Flat Washer
c.
(4) 1/2”-13 Nylock Nut
a
b
b
c
Upper Yoke Side View
The angle irons should be aligned with the outermost holes of the upper yoke.
Les cornières devraient être alignées avec les trous extérieurs de la culasse supérieur.
After attaching upper yoke to the angle irons, tighten all the bolts securing the angle irons to the roof
structure to 90 ft-lb (122 N-m) using a 3/4” socket with torque wrench.
Après l’avoir fixée culasse supérieure aux cornières, serrer tous les boulons de fixation des cornières à la
structure du toit à 90 lb-pi (122 Nm) avec une “prise 3/4 avec une clé dynamométrique.
CAUTION/ATTENTION
!
11 1/4” (28.32cm)
Upper Yoke Top View
13 3/4” (34.9cm) x 8” (20.32cm)
5 1/2”
(13.97cm)