
8 Communication
14
/
32
Procedure steps:
1) Route the network cable through threaded sleeve;
FIG. 7-17 Route the Network Cable
2) Prepare the RJ45 plug according to the line sequence;
FIG. 7-18 Prepare the RJ45 Plug
3) Insert the RJ45 plug kit to the DRM receptacle on the inverter, and tighten the locknut;
8 Communication
8.1 Inverter monitoring connection
The inverter can be monitored via a WiFi data logger, connect to the RS485 port.
More details for installation and operation methods please refer to the WiFi data logger user manual.
FIG. 8-1 Communication Port
9 CSI CloudPro APP
For more detailed information about this APP, please refer to ANNEX E: CSI CloudPro APP.
10 Commissioning Inverter
10.1 Electrical Inspection
1) Check PE connections with multi-meter:
To make sure all the bare metal surfaces of the inverter are grounded.
2) Check DC voltage value: