PARTS TO BE INSTALLED
Battery Installation
1. If front storage module is installed, carry out the
following:
– Open front storage compartment cover.
– Unzip storage compartment liner for access
to battery access panel.
– Remove battery access panel.
2. Insert battery in battery rack with battery posts
facing out.
NOTICE
Always charge battery before its in-
stallation on the vehicle.
3. Connect RED (+) positive battery cables first us-
ing battery screws and square nutS from the
PDI kit.
WARNING
Always connect RED (+) cable first.
4. Connect BLACK (–) negative battery cables sec-
ond using battery screw and nut from the PDI
kit.
PART
SPECIFIEDTORQUE
Battery post screws
4 N•m (35 lbf•
in
)
rbl2013-003-013_a
1. Battery
2. RED (+) positive battery cable
3. Positive post battery screw
5. Apply dielectric grease on battery posts.
SERVICE PRODUCT
Battery posts
DIELECTRIC GREASE
(P/N 293 550 004)
6. Install RED rubber boot cover.
rbl2013-003-013_b
1. Battery
2. Black (-) negative battery cable
3. Negative post battery screw
4. RED rubber boot cover
7. Position battery retaining bracket over battery.
Be sure to properly engage it in the frame front
member.
8. Install rubber retaining strap.
rbl2013-003-014_a
1. Battery
2. Retaining bracket
3. Rubber strap
4. Hook on lower front frame member
AAPTS (Ambient Air Pressure
and Temperature Sensor)
Installation
1. Connect AAPTS connector and route cable
through retaining guide clips (RH side of cargo
module).
PREDELIVERY
2014-3
17 / 41