Summary of Contents for CPEC200
Page 1: ...CPEC200 Closed Path Eddy Covariance System Quick Deploy Guide February 2016 ...
Page 3: ...2 Ground tripod and enclosures Ground Lug Grounding Rod ...
Page 4: ...3 Setup tripod or mast with CM20X Crossarm Crossarm To Pole Bracket CM20X Crossarm ...
Page 5: ...4 Mount the EC155 bypass tube EC155 bypass tube Mounting clip ...
Page 12: ...9 3 Select SONIC_AZIMU 9 4 Enter the CSAT3A sonic head azimuth ...