CM375 Portable 10-Meter Mast
Step 2:
Attach SOUTH cables to anchor. While first person holds mast and
uses a pole level, the second person adjusts each of the bottom guy cable
wedge clamps, maintaining level in all directions (see Figure 2.5-2). The rope
ratchet can be used to temporarily remove the load from the wedge assembly
during wedge adjustments.
FIGURE 2.5-2. Pole Level Ensures Vertical Mast
Step 3:
Repeat process with the top guy cables to establish a straight mast.
Step 4:
Apply further tensioning using the turnbuckles (see Figure 2.5-3).
FIGURE 2.5-3. Adjusting Turnbuckles
18
Summary of Contents for CM375
Page 24: ...CM375 Portable 10 Meter Mast 20 ...
Page 25: ......