
FT-301 Segovia Fountain
Three people are recommended for the installation of this fountain!
Revised July 26, 2017
Assemble your fountain on a level surface capable of holding a minimum of 899 pounds with an approximate 6
square foot footprint.
FT-301C (520 lbs)
42”L x 21”W x 16”H
FT-301A (190 lbs)
41”L x 9.25”W x 29.5”H
FT-301B (22lbs)
10”L x 6”W x 14.25”H
1.
Place the basin (FT-301C) into position where the
fountain will be installed, ensuring that it is level.
2.
Assemble the pump kit.
a.
Connect the tubing assembly to the pump by
fitting the tubing over the pump water outlet.
3.
Lay the pump cord over the channel at the top/back of
the basin (FT-301C).
4.
Place the #7 drain stopper into the hole in the bottom of
the basin.
5.
Place the galvanized pipes into the holes at the top 2
back corners of the basin.
6.
Carefully lift the water feature (FT-301A) and place it
down onto the basin so that the galvanized pipe goes
into the holes at the bottom of the water feature.
a.
Be sure not to pinch the pump cord between the
water feature and the basin.
7.
Insert the CPVC end of the tubing assembly into the
CPVC coupling in the bottom/center of the water
feature (FT-301A).
8.
Place the #5 drain stopper into the bowl on the water
feature.
9.
Place the pump cover (FT-301B) into position over the
pump and in front of the tubing assembly.
10.
Fill the fountain with water.