background image

FT-181 Aya Fountain

Assembly Instructions

Step 7 -

Insert the CPVC end o

the tubing into the bottom o

the water

eature (FT-181A).

Step 8 -

Place the water

eature into the basin ensuring that it is level.

8a -

Turn the

eature and coil the tubing as you lower it into position.

FT-181A (8 lbs)

10"W x 6.5"H

Reviews: