FT-181 Aya Fountain
Assembly Instructions
Step 7 -
Insert the CPVC end o
the tubing into the bottom o
the water
eature (FT-181A).
Step 8 -
Place the water
eature into the basin ensuring that it is level.
8a -
Turn the
eature and coil the tubing as you lower it into position.
FT-181A (8 lbs)
10"W x 6.5"H