background image

FT-362 Bebel Fountain, Tall 

Assembly Instructions

Assemble your fountain on a level surface capable of holding a minimum of 175 lbs with 

an approximate 0.5 sq. ft. footprint (actual dimensions 7" Diam.).

Step 1 -   

Position the basin (FT-361B) where the fountain is to be installed, ensuring that it is level.

Step 2 -   

Assemble the pump kit:

 

2a - 

Using a hose clamp, attach the 1/2" non-kink tubing to the pump outlet.

 

2b -

 Place the stopper around the pump cord approximately 6 inches from the pump.

Step 3 -   

Feed the pump cord through the hole in the basin (FT-361B) and out of the channel.

Step 4 -   

FIRMLY press the stopper into the hole evenly.

 

4a -   Note: Using the handle of a screwdriver or hammer works best to press the 

stopper in place.

FT-361B (117 lbs) 

15.5"W x 21"H

Step 5 -   

Insert the CPVC end of the tubing assembly into the coupling at the bottom of the water 

feature (FT-362A).

Step 6 -  

Place the water feature (FT-362A) into the basin (FT-361B) ensuring that it is level.

 

6a -

 Turn the feature and coil the tubing as you lower it into position.

Step 7 -  

Fill the fountain with water.

FT-362A (14 lbs)

 

11.5"W x 1.75"H

Reviews: