Installation, Operation and Maintenance Manual

DESCRIPTION

The Wheatley 822/820 swing check valve features a hinged stainless steel clapper with a lip type seal. The 

design allows the clapper to swing freely from the closed position to the fully opened position and back. 

The cover is threaded to the body and sealed with an O-ring. The cover Is equipped with 1/4” NPT bonnet 

access port except sizes 1/2”, 3/4”, 1”. The swing check valve is a full bore type that will pass a sphere 

with a nominal size not less that that specified in Table 1 of API 6D.

Due to the critical nature of pressurized piping systems it is recommended that the compatibility to the 

service of the metallic and non-metallic components be confirmed prior to installation. This valve is not 

recommended for slurry service. 

!

CAUTION

READ CAREFULLY BEFORE INSTALLING OR OPERATING THE VALVE

Hazards are inherent with the construction, operation, and maintenance of high pressure piping 
systems. The following information and precautions are provided to minimize these hazards: 

1. 

The valve’s nameplate indicates maximum operating pressure as well as minimum and  

 

maximum operating temperatures. The valve may be safely operated within these limits. 

2. 

The valve’s end connections are available in threaded (NPT), socket weld, and  

 

 

grooved configurations 

3. 

If the valve is equipped with socket weld ends, it is recommended that the valve be    

 

disassembled prior to welding into the flow system. This will prevent damage to valve  

 

seals due to heat from welding. Removal of cover pipe plug and clapper seal are not  

 

required at  disassembly.  After welding, reassemble the valve according to the  

 

 

Reassembly Instructions on page six.  

4. 

The valve has been factory pressure tested based on the nameplate maximum   

 

 

operating pressure. 

5. 

These valves may be lifted with slings if required. Fittings and other devices, which may  

 

be attached to the valve, are not intended to be used as lifting points. Always follow local  

 

safety regulations when lifting heavy valves.

6. 

WHEATLEY valves are designed, manufactured, and tested under a certified quality    

 

system. Only quality parts and materials are used in the assembly of WHEATLEY  valves.  

 

Pressure containing components are suitable for the minimum temperature marked on  

 

the nameplate. Factory certification is available. 

7. 

If the valve, in service, is exposed to hazards such as traffic, wind, or earthquake loading,  

 

contact the factory, to confirm that the valve design is suitable for the  

 

 

 

application. The factory requires a complete description of the hazard before making    

 

any recommendations. 

Summary of Contents for WHEATLEY 820 Series

Page 1: ...DISTRIBUTED VALVES WHEATLEY Series 822 820 Swing Check Valve WHEATLEY Installation Operation and Maintenance Manual...

Page 2: ...2011 IOM WHE CHECK 822 Installation Operation and Maintenance Manual WHEATLEY SERIES 822 820 CHECK VALVE Description 3 Installation Operation 5 Maintenance 6 Maintenance Schedule 7 Recommended Spare P...

Page 3: ...alve may be safely operated within these limits 2 The valve s end connections are available in threaded NPT socket weld and grooved configurations 3 If the valve is equipped with socket weld ends it i...

Page 4: ...normal operating conditions hazards such as material fatique brittle fracture creep rupture or buckling will not occur Do not operate the valve beyond the pressures and temperatures marked on the name...

Page 5: ...ve in the horizontal position install the valve with the arrow mark on the body pointing in the direction of flow and the cover side up OPERATION Flow through the valve in the direction of the arrow m...

Page 6: ...safely from the cover Drain the valve fully through the piping system Remove the cover clapper and hanger Figure 1 For offline maintenance the valve should be removed from the pipeline INSPECTION Insp...

Page 7: ...7 3 143 157 174 201 4 114 125 232 255 2 1 3 4 6 5 7 MAINTENANCE SCHEDULE The frequency of the maintenance depends on the service conditions Please contact the factory regarding the maintenance schedul...

Page 8: ...IOM WHE CHECK 822 Installation Operation and Maintenance Manual VALVES MEASUREMENT 3250 Briarpark Drive Suite 300 Houston TX 77042 USA Toll 800 323 9160 For the most current contact and location infor...