background image

24h

100

P

ag

e 7  - M

an

u

al

 c

od

e: 

11

9

A

U

0

3

E

N

11

9

A

U

0

3

E

N

 ve

rs

5

  0

3

/2

0

1

6  © C

A

M

E S

.p.

A

. - T

h

e d

ata a

n

d i

nf

or

m

ati

on p

rovi

d

ed

 in

 th

is

 m

an

u

al

 a

re s

u

b

je

ct to c

h

an

g

e at a

ny ti

m

e w

ith

ou

t p

rio

r n

ot

ic

e by C

A

M

E S

.p.

A

.

Installing the foundation box

Before placing the casing, choose in which direction the leaf will open.
Lean the box against the pillar making sure that the corrugated pipes and the drain pipe pass through the designated holes. 
Fill the hole with concrete.
Position the box level with the ground and place the pin in line with the upper gate hinge. Leave to solidify for at least 24 hours.
Clean any remaining concrete from inside the box.

Lubricate the box pin, the brass, the arm unit and the upper arm. Assemble everything as shown in the drawing.

Upper arm

Arm unit 

Brass 

Pin 

Summary of Contents for FROG MD

Page 1: ...UNDERGROUND OPERATOR FOR SWING GATES 119AU03EN Installation manual FROG MD FROG MS English EN...

Page 2: ...ATE S PLATE WHERE NECESSARY AND IN A VISIBLE PLACE SPECIAL USER INSTRUCTIONS AND RECOMMENDATIONS KEEP GATE OPERATION AREAS CLEAN AND FREE OF ANY OBSTRUCTIONS MAKE SURE THAT THE PHOTOCELLS ARE FREE OF...

Page 3: ...bited Technical data Type FROG MD FROG MS Motor power supply V 50 60 Hz 230 400 AC Power supply V 50 60 Hz 230 400 AC Power W 600 Power draw A 2 5 max Torque Nm 1000 max Opening time to 95 sec 45 Gear...

Page 4: ...16 CAME S p A The data and information provided in this manual are subject to change at any time without prior notice by CAME S p A Dimensions Description of the components 1 Tie rod 2 Motor arm 3 Gea...

Page 5: ...u have all the tools and materials you will need for the installation at hand to work in total safety and compliance with current standards and regulations The figure shows some examples of installer...

Page 6: ...Drainage chamber 11 Mechanical stops Laying the corrugated pipes and inspection chambers Make the hole for the box Prepare the junction boxes and corrugated pipes necessary for connection to the insp...

Page 7: ...af will open Lean the box against the pillar making sure that the corrugated pipes and the drain pipe pass through the designated holes Fill the hole with concrete Position the box level with the grou...

Page 8: ...hinge Check that the leaf opens and closes without difficulty Secure using suitable screws or weld the leaf carefully to the upper arm Securing the gearmotor N B the figures below are shown from the...

Page 9: ...ny time without prior notice by CAME S p A Secure the tie rod between the motor arm and the arm unit in the prepared holes using nuts and bolts N B the arms have several holes in order to obtain vario...

Page 10: ...f its run with the motor arm Secure the nuts Mechanical stop Motor arm R OUTER entry exit INNER L R OUTER entry exit INNER L Establishing the limit switch points For opening completely open the leaves...

Page 11: ...y CAME S p A Three phase 230 VAC 50 60 Hz power supply Delayed closing gearmotor connection Three phase 400 VAC 50 60 Hz power supply Delayed opening gearmotor connection Delayed closing gearmotor con...

Page 12: ...onnecting the close end run to the delayed opening gearmotor 3 Connecting the close end run to the delayed closing gearmotor 4 Connecting the open end run to the delayed closing gearmotor BLACK BLACK...

Page 13: ...re the only procedures that vary compared to standard installations L R OUTER entry exit INNER L R OUTER entry exit INNER For closing completely shut the leaves turn the left hand gearmotor cam clockw...

Page 14: ..._______________________________________________________________________________________ Extraordinary maintenance log Extraordinary maintenance The table below is used to note any extraordinary mainte...

Page 15: ...______________________________________________________________________ DISMANTLING AND DISPOSAL CAME S p A implements an EN ISO 14001 certified and compliant Environmental Management System at its pla...

Page 16: ...dienst bei ES Por cualquier informaci n sobre la empresa los productos y asistencia en su idioma NL Voor meer informatie over het bedrijf de producten en hulp in uw eigen taal PT Para toda e qualquer...

Reviews: