24h
100
P
ag
e 7 - M
an
u
al
c
od
e:
11
9
A
U
0
3
E
N
11
9
A
U
0
3
E
N
ve
rs
.
5
0
3
/2
0
1
6 © C
A
M
E S
.p.
A
. - T
h
e d
ata a
n
d i
nf
or
m
ati
on p
rovi
d
ed
in
th
is
m
an
u
al
a
re s
u
b
je
ct to c
h
an
g
e at a
ny ti
m
e w
ith
ou
t p
rio
r n
ot
ic
e by C
A
M
E S
.p.
A
.
Installing the foundation box
Before placing the casing, choose in which direction the leaf will open.
Lean the box against the pillar making sure that the corrugated pipes and the drain pipe pass through the designated holes.
Fill the hole with concrete.
Position the box level with the ground and place the pin in line with the upper gate hinge. Leave to solidify for at least 24 hours.
Clean any remaining concrete from inside the box.
Lubricate the box pin, the brass, the arm unit and the upper arm. Assemble everything as shown in the drawing.
Upper arm
Arm unit
Brass
Pin