CAME FAST-S24 KIT Installation Manual Download Page 5

p. 

55

 - 

M

an

ua

l c

od

e:  

11

9

D

U

3

1

E

N

 

11

9

D

U

3

1

E

N

 

ve

r.

 6

 

 6 

 01

/2

01

5

  © C

A

M

E S

.p.

A

. - T

he d

ata a

nd i

nf

or

m

ati

on i

n th

is m

an

ua

l m

ay b

e c

ha

ng

ed at a

ny ti

m

e a

nd w

ith

ou

t o

bl

ig

ati

on o

n th

e p

art of C

am

C

A

M

E S

.p.

A

. to n

otify s

ai

d c

ha

ng

es.

ENGLISH 

N.B. If cables are of a different length than that shown in the table, determine the cable section based on the actual draw and the 
number of connected devices and according the what is set forth in the CEI EN 60204-1 code of regulations.
For connections featuring several loads on the same line (i.e. sequential ones), the dimensions shown on the table must be 
reconsidered according to the total draw and actual distances.  When connecting products not featured in this manual, only refer 
to the literature accompanying such products.

5.3 Cable types and minimum thickness

Connection for

Cable type

Cable length  

1 < 10 m

Cable length 

10 < 20 m 

Cable length 

20 < 30 m

230 V power supply to control panel

FROR CEI 

20-22 

CEI EN 

50267-2-1

3G x 1.5 mm

2

3G x 2.5 mm

2

3G x 4 mm

2

Motor power supply (V) 24 V

3 x 1 mm

2

3 x 1.5 mm

2

3 x 2.5 mm

2

Flashing light

2 x 0.5 mm

2

2 x 1 mm

2

2 x 1.5 mm

2

Photocell transmitters

2 x 0.5 mm

2

2 x 0.5 mm

2

2 x 0.5 mm

2

Photocell receivers

4 x 0.5 mm

2

4 x 0.5 mm

2

4 x 0.5 mm

2

Accessories power source

2 x 0.5 mm

2

2 x 0.5 mm

2

2 x 1 mm

2

Safety and command devices

2 x 0,5 mm

2

2 x 0.5 mm

2

2 x 0.5 mm

2

Antenna

RG58

max. 10 m

5 Installation

Before beginning to install, do the following:

•    Set up a suitable omnipolar cut-off device, with distances greater than 3 mm between contacts, wit sectioned power source;

•   Set up proper conduits and electric cable raceways, making sure these are protected from any mechanical damage;

•  

 Check that any connections inside the container (made for continuity purposes of the protective circuit) be fitted with extra 

insulation compared to other internal conductive parts;

•   Make sure the gate structure is sturdy enough, that the hinges are efficient and that there is no friction among the fixed and 

moving parts. 

•   Make sure there are opening and closing strike plates.

Installation must be carried by skilled, qualified technicians in accordance with current regulations.

5.1 Preliminary checks

www.metalines.com

[email protected]

Summary of Contents for FAST-S24 KIT

Page 1: ...F7024N OPERATOR FOR SWING GATES INSTALLATION MANUAL English EN 119DU31EN www metalines com sales metalines com...

Page 2: ...areas clean and free of any obstructions Make sure that the photocells are free of any overgrown vegetation and that the operator s area of operation is free of any obstructions Do not allow children...

Page 3: ...on and use other than that specified in this manual is forbidden 3 Reference standards 2 2 Limitations to use Self locking gearmotor complete with jointed transmission arm for gate leaves up to 2 3 m...

Page 4: ...ame CAME S p A to notify said changes ENGLISH 4 4 Ddimensions 4 3 Description of parts 1 Gearmotor 2 Post fastening bracket 3 Articulated arm 4 Gate fastening bracket Hinge Closing strike plate i 240...

Page 5: ...er supply V 24 V 3 x 1 mm2 3 x 1 5 mm2 3 x 2 5 mm2 Flashing light 2 x 0 5 mm2 2 x 1 mm2 2 x 1 5 mm2 Photocell transmitters 2 x 0 5 mm2 2 x 0 5 mm2 2 x 0 5 mm2 Photocell receivers 4 x 0 5 mm2 4 x 0 5 m...

Page 6: ...anges ENGLISH Make sure you have all the tools and materials needed to carry out the installation in total safety and in accordance with current regulations The figure shows some examples of the tools...

Page 7: ...for the materials and post Fasten the base plate using fastening elements suitable for the materials and post Fasten bracket A to gate the leaf according to the measurements in the table 2 2 Limitatio...

Page 8: ...and fasten it using the two issued M8x90 screws and M8 nuts 4 Fit and fasten the straight arm in to the gearmotor shaft using a plug bolt and accompanying distancer Lubricate the bushing t it onto the...

Page 9: ...ny time and without obligation on the part of Came CAME S p A to notify said changes ENGLISH To release the gearmotor used the lever located above the rod 5 8 Releasing the gearmotor 5 9 Micro switch...

Page 10: ...AME S p A to notify said changes ENGLISH Install the control panel and make the required electrical connections shown in the gure 5 10 Electrical connections to the control panel Once nished with moun...

Page 11: ...t of the photocells during closing movement phase If the operator inverts movement or blocks itself the photocells are working properly This is the only maintenance job that can be done to the gate wh...

Page 12: ...o power supply The gearmotor is released The transmitter battery is run down The transmitter is out of order The stop button is stuck or broken The opening closing button or key switch selector are br...

Page 13: ..._______________________________________________________________________________ __________________________________________________________________________________________________ Installer s stamp Ope...

Page 14: ...ckaging i e cardboard plastic etc are solid urban waste and may be disposed of without much trouble simply by separating them for recycling Before proceeding it is always a good idea to check your loc...

Page 15: ...on on the part of Came CAME S p A to notify said changes ENGLISH 9 Compliance statement Declaration CAME S p A declares that this device complies with the essential requirements and other relevant pro...

Page 16: ...l ngua PL Wszystkie inne informacje dotycz ce rmy produkt w oraz us ug i pomocy technicznej w Waszym j zyku znajduj si na stronie RU HU A v llalatra term keire s a m szaki szervizre vonatkoz minden to...

Reviews: