background image

Pa

g

5

  - M

an

u

al

 c

od

e: 

11

9

G

3

7

8

4

E

N

11

9

G

3

7

8

4

E

N

 ve

r.

 

2

  

2  

0

2

/2

0

14  © C

A

M

E

 c

an

ce

lli

 auto

m

ati

ci

 S

.p.

A

. - T

h

e d

ata a

n

d i

n

fo

rm

ati

on p

rovi

d

ed

 in

 th

is

 m

an

u

al

 a

re s

u

b

je

ct to c

h

an

g

e at a

ny ti

m

e w

ith

ou

t p

ri

or n

oti

ce

 by C

A

M

E

 C

an

ce

lli

 A

u

to

m

ati

ci

 S

.p.a.

Examples of use

Standard installation

Wall flanking installation

Multiple installation
(mm)

 

The output managed by a turnstile should not be considered an emergency exit! Always provide an exit for emergency situations and for the physically impaired.

Recommended distance.

Preliminary checks 

PSAP08

PSAP08

PSAP07N

PSAP07N

Tools and materials

 

The following is necessary before installing the turnstile:

•  If necessary provide for the corrugated tubing to route electrical cables;
•  Provide a suitable single-pole disconnector with a maximum of 3 mm between the contacts, to disconnect the power supply;
•  Prepare piping and ducts suitable for routing the electrical cables, ensuring protection against mechanical damage;

• 

 

 make sure that any connections within the container (made to ensure the continuity of the protection circuit) are fitted with additional insulation compared to 

the other internal conductor parts.

Types of cables and minimum thicknesses

PSAP08

PSAP08

PSAP07N

PSAP07N

 If the cables differ in length compared to what is shown in the table, the cable cross-section is determined according to the actual current draw of the devices 

connected and according to the provisions of the IEC EN 60204-1 standard.
For connections that require several, sequential loads, the sizes given on the table must be re-evaluated based on actual power draw and effective distances. When 
connecting products that are not specified in this manual, please refer to the documentation provided with said products.

Connection

Cable type

Cable length

1 < 10 m

Cable length

10 < 20 m 

Cable length

20 < 30 m

Control panel power supply 120/230 V

FROR CEI 20-22 

IEC EN 

50267-2-1

3G x 1.5 mm

2

3G x 1.5 mm

2

3G x 1.5 mm

2

Accessory power supply

2 x 0.5 mm

2

2 x 0.5 mm

2

2 x 1 mm

2

Control and safety devices

2 x 0.5 mm

2

2 x 0.5 mm

2

2 x 0.5 mm

2

Make sure you have all the tools and materials you will need for the installation at hand to 
work in total safety and compliance with current standards and regulations. The figure shows 
some examples of installer’s tools.

INSTALLATION

The following illustrations are only examples, given that the space for securing the turnstile and accessories varies depending on the overall dimensions. The 
installation technician is responsible for choosing the most suitable solution.

The turnstile must be mounted by two people. Transport and lift using appropriate lifting equipment.

 Risk of tipping over! Do not lean on the turnstile until it is fully secured.

GENERAL INSTRUCTIONS FOR INSTALLATION

 

Installation must be carried out by qualified and experienced personnel in compliance with applicable regulations.

Summary of Contents for BRIDGE PSAP01

Page 1: ...INSTALLATION MANUAL English EN TRIPOD TURNSTILES BRIDGE PSAP01 PSAP07N PSAP08 119G3784EN...

Page 2: ...1 5 m and must not be accessible to the public The turnstile identi cation data must be clearly visible Before connecting the turnstile to the power supply make sure the identi cation data correspond...

Page 3: ...pod release in the event of a blackout 001PSAP08 Two way mechanical turnstile in galvanised painted steel RAL 7035 complete with control board hydraulic damper and LED direction arrows Automatic tripo...

Page 4: ...tal casing 4 Housing 5 Top cover 6 Mechanism 7 TOR100A control panel 8 Cover lock 9 Screws and washers for fixing the legs to the casing Dimensions Example of a system 1 Tripod turnstile 2 Direction a...

Page 5: ...o the actual current draw of the devices connected and according to the provisions of the IEC EN 60204 1 standard For connections that require several sequential loads the sizes given on the table mus...

Page 6: ...turnstile Open the lock using the key lift the cover and slightly pull it forward while pulling it upwards Lift the casings and remove them Attach the arms to the head of the tripod with screws M10x60...

Page 7: ...d Once you have determined the location use a pencil to mark the drill holes according to the dimensions indicated mm Place the turnstile over the wall dowels If present the corrugated conduit for the...

Page 8: ...e cables and Ref Description L1T White L2T Red Black isolated Ref Description L1T White Red isolated L2T Black Replace the 1 6A line fuse with a 3 15 A unit Operations reserved for the installing tech...

Page 9: ...08 PSAP07N PSAP07N Stop button N C contact Blocks the turnstile Anti clockwise operation button N O contact Allows anti clockwise unlocking of the tripod The tripod will lock automatically after a xed...

Page 10: ...t be taken into account to properly adjust the hydraulic damper Remove line voltage during installation and make sure that the tripod moves freely Loosen the nut Acting on the tripod perform simulated...

Page 11: ...rvice Restore the spring Check the contact The turnstile remains locked The free direction cam is incorrectly positioned or damaged The person going through leaned on the arm before it was released Bo...

Page 12: ...nd other relevant provisions established in Directives 2006 95 EC and 2004 108 EC A true copy of the declaration of conformity is available upon request DISMANTLING AND DISPOSAL CAME CANCELLI AUTOMATI...

Reviews:

Related manuals for BRIDGE PSAP01