
Page
14
- Manual
FA01295-EN
- 03/2023 - © C
AME S.p.A. - The contents of this manual may be changed at any time and without notice. - T
ranslation of the o
riginal instructions
Remove the nuts from the screws.
Insert the electrical cables into the tubes until they protrude by about 600 mm.
Setting up the operator
Remove the front cover.
1
2
3
Remove the operator cover.
4
5
Place the operator on top of the anchoring plate.
The electrical cables must pass under the operator foundation frame
Lift the operator by 5-10 mm from the plate by adjusting the threaded feet, to allow for any adjustments that may need to be made between the rack and pinion.
5 ÷ 10