background image

FA00526-EN – ver. 3.3.1 – 12/2016      

 

3.

INSTALLATION

Remove the caps and remove the cover extruded. If you need to reduce the length of the profile cut, being 
careful to avoid metal slag from falling onto electronic circuits. Drill the aluminum profile at two ends (for the 
barriers longer may require additional holes, in which case it may be necessary to temporarily disconnect the 
connection cable) and secure the profile to the wall. 
Place the optics to the desired height by turning the screws on the circuit, make the connections to the terminal 
blocks and seal the cable routing to prevent the entry of water and insects. 
Make sure the screws are tight so that there is electrical contact between the board and the metal section that 
acts as a screen to interference. 

Select, activating dip switch, the number of pairs of bundles installed in the barrier. 

N.B.  Make sure that the expansions are properly connected (OUT>IN). 

BEAM: move the ON DIPSWITCH up to the 
corresponding number of expansions added to 
the barrier. Failure to shift the DIPSWITCH 
ON exclude the operation of its beam  
Example 6 expansions added 

AND

ON activates detection double-beam

(delay time 500 msec) 

FAST

: single detection beam

(delay time 100 msec) 

Fixing screw 

LED SYNC

: indicates the operation of the

synchronism 

Summary of Contents for BI205

Page 1: ...Installation manual BI205 BI205W BI410 BI410W BI615 BI615W BI820 BI820W BI825 BI825W FA00526 EN...

Page 2: ...n board the receiver will indicate the alarm status via an LED indicator and relay contact placed on the card The interlocking profile allows you to insert or remove the cover of polycarbonate without...

Page 3: ...If you need to reduce the length of profile cutting and taking care to avoid metal slag from falling onto electronic circuits 3 Insert the sqaure gasket in the cap up to the square to match 4 Insert...

Page 4: ...grooves present on the cap and on the cover to allow the passage of the cable from the outside of the barrier CABLE CASHED VIEWABLE CABLE Round grooves on the bottom for cable Grooves on the walls fo...

Page 5: ...e of rainwater that could accumulate inside the closing 9 Attach the whole structure to the wall you can make small adjustments both horizontally and vertically thanks to the holes located on the caps...

Page 6: ...nal blocks and seal the cable routing to prevent the entry of water and insects Make sure the screws are tight so that there is electrical contact between the board and the metal section that acts as...

Page 7: ...the barrier interrupting a pair of beams at a time making sure the ALARM LED is lit After test complete program the desired operating mode as reported in the table below Programming has been complete...

Page 8: ...relay you MUST link between the transmitter and the receiver SADRIN TX SADRIN RX the two wire synchronous sync TX to SincRX sync TX to sync RX NB Only for expansions is provided the switch The beam 1...

Page 9: ...to the negative of 13 8 VDC to all columns 6 TECHNICAL CHARACTERISTICS MODEL SADRIN 205 SADRIN 410 SADRIN 615 SADRIN 820 Max range outdoor Blak 15m White 5m Sinchronism wired Dual beam optical Yes wi...

Page 10: ...COMMERCIAL PRODUCT Came S p A Via Martiri Della Libert 15 IT 31030 DOSSON DI CASIER TV TEL 39 0422 4940 FAX 39 0422 4941 info came com www came com...

Reviews: