background image

P

age 

23

 - Manual 

FA01359-EN

  - 03/2021 - © C

AME S.p.A. - The contents of this manual may be changed at any time and without notice. - T

ranslation of the o

riginal instructions

Peripheral number

Assign a unique identifi cation code (CRP address) to the control board. It is used where there are multiple operators connected 
to the same communication BUS with CRP protocol.

F56

Peripheral number

from 1 to 255

Communication speed

Set the communication speed of the remote connection system.

F63

Communication speed

0 = 1200 bps
1 = 2400 bps
2 = 4800 bps
3 = 9600 bps
4 = 14400 bps
5 = 19200 bps
6 = 38400 bps (default)
7 = 57600 bps
8 = 115200 bps

RIO ED T1

Associate one of the available functions with a wireless safety device.
The function only appears if there is an interface board for wireless devices.

F65

RIO ED T1

OFF (Default)
P0 = It stops the gate and excludes 
automatic closing. Use a control device 
to resume movement.
P7 = Reopen while closing.
P8 = Reclose while opening.

RIO ED T2

Associate one of the available functions with a wireless safety device.
The function only appears if there is an interface board for wireless devices.

F66

RIO ED T2

OFF (Default)
P0 = It stops the gate and excludes 
automatic closing. Use a control device 
to resume movement.
P7 = Reopen while closing.
P8 = Reclose while opening.

Summary of Contents for ATS50DGS

Page 1: ...Gearmotor for swing gates ATS30DGS ATS50DGS ATS30DGR INSTALLATION MANUAL FA01561 EN EN English...

Page 2: ...1 2 3 1 2 3 4...

Page 3: ...tc Make sure you have set up a suitable dual pole cut off device along the power supply that is compliant with the installation rules It should completely cut off the power supply according to categor...

Page 4: ...tegies Simply follow these brief disposal guidelines DISPOSING OF THE PACKAGING The packaging materials cardboard plastic etc can be disposed of easily as solid urban waste separated for recycling Bef...

Page 5: ...rsible telescopic gearmotor 24 V with encoder for swing gates with Max C up to 200 mm with leaf up to 5 m and 400 kg Grey RAL7024 801MP 0110 ATS30DGR Irreversible telescopic gearmotor 24 V with encode...

Page 6: ...pressure level dB A 70 70 70 Protection rating IP 54 54 54 Insulation class I I I Reduction ratio i 28 28 28 Weight kg 7 5 8 7 5 Cable types and minimum thicknesses Cable length m up to 20 from 20 to...

Page 7: ...for fitting the operator and accessories varies depending on the area where it is installed It is up to the installer to find the most suitable solution The drawings refer to a gearmotor installed on...

Page 8: ...leaf to 90 or 120 First determine where the gate bracket needs to be positioned then where the post bracket needs to be positioned Respect the values indicated in the table A C B 60 60 E F 5 ATS30DGS...

Page 9: ...ithout notice Translation of the original instructions Fastening the brackets Secure the post bracket with plugs and screws The holes on the bracket fixing plate allow you to vary the opening angle of...

Page 10: ...hanged at any time and without notice Translation of the original instructions Fastening the gearmotor Lubricate all moving parts on the operator A The self locking nut must be loosely tightened so as...

Page 11: ...ICAL CONNECTIONS Before working on the control panel disconnect the mains power supply and remove the batteries if any Remove the protective cover to access the terminal board A Control panel B Gearmo...

Page 12: ...form the operations on both gearmotors Release the gearmotor Manually open the leaf to the desired point Disconnect the 9 pole terminal board Connect the multimeter set to check continuity to the Ra R...

Page 13: ...on the multimeter Turn the shaft C ANTICLOCKWISE to determine the closing travel end point until the Rc Rc contact opens and the multimeter stops buzzing If you want to decrease the closing angle the...

Page 14: ...tablishing the bracket fastening points Close the gate manually First determine where the gate bracket needs to be positioned then where the post bracket needs to be positioned Respect the values indi...

Page 15: ...ical connections Before working on the control panel disconnect the mains power supply and remove the batteries if any Remove the protective cover to access the terminal board A Control panel B Gearmo...

Page 16: ...el range To move the microswitch 10 mm in either direction turn the rod 20 times A C Determining the opening end of travel points Perform the operations on both gearmotors Release the gearmotor Manual...

Page 17: ...the 9 pole terminal board Connect the multimeter set to check continuity to the Ra Ra terminals NC contact a buzzer will sound on the multimeter Turn the shaft A CLOCKWISE to determine the closing tr...

Page 18: ...If the system is not used for long periods of time e g for installations at sites with seasonal closures disconnect the power supply When the power supply is reconnected check the system is working c...

Page 19: ...Page 19 Manual FA01561 EN 02 2021 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions...

Page 20: ...AME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions CAME S p A Via Martiri della Libert 15 31030 Dosson di Casier Treviso Italy...

Page 21: ...ZL65 INSTALLATION MANUAL FA01359 EN EN English...

Page 22: ...led and quali ed personnel and in full compliance with the regulations in force The device must be installed wired connected and tested according to good professional practice in compliance with the s...

Page 23: ...ntrol this must be installed at a minimum height of 1 5 m from the ground and must not be accessible to the public If not already present apply a permanent tag that describes how to use the manual rel...

Page 24: ...ging materials cardboard plastic etc can be disposed of easily as solid urban waste separated for recycling Before dismantling and disposing of the product please always check the local laws in force...

Page 25: ...ed are in millimetres Description 002ZL65 Control panel for one or two leaf swing gates with programming display on board radio decoding and self diagnosing safety devices Technical data MODELS ZL65 P...

Page 26: ...es 8 Terminal board for CRP connection 9 Terminal board for connecting the transponder selector switch 10 Terminal board for connecting the keypad selector 11 Terminal board for connecting the antenna...

Page 27: ...V and outdoors use H05RN F cables compliant with 60245 IEC 57 IEC when operating indoors use H05VV F cables compliant with 60227 IEC 53 IEC For power supplies up to 48 V you can use FROR 20 22 II cab...

Page 28: ...nts of this manual may be changed at any time and without notice Translation of the original instructions INSTALLATION Preparing the control panel 1 Separate the parts of the control panel 2 Drill the...

Page 29: ...anslation of the original instructions Fastening the control panel 1 Drill the xing points in the control panel in a protected area 2 Fasten the base using screws and plugs Use Phillips round head scr...

Page 30: ...hout notice Translation of the original instructions ELECTRICAL CONNECTIONS Preparing the electrical cables Connect all wires and cables in compliance with the law Use cable glands to connect the devi...

Page 31: ...ers 24 V AC The output delivers 24 V DC when the batteries start operating if they are installed 10 11 E 5 Maximum capacity of contacts Device Output Power supply V Power W Accessories 10 11 24 AC DC...

Page 32: ...ce to resume movement If the contact is not used it must be deactivated during programming 2 Control device NO contact PARTIAL OPENING function PEDESTRIAN OPENING function OPEN ONLY function See funct...

Page 33: ...t ashes when the operator opens and closes See function F18 additional light 2 Additional light It increases the light in the manoeuvring area See function F18 additional light 3 Operator status warni...

Page 34: ...and or CY inputs If contacts CX and or CY are not used they must be deactivated during programming DELTA photocells Standard connection DELTA photocells Connection with safety test See function F5 Saf...

Page 35: ...ut notice Translation of the original instructions DXR photocells Standard connection DXR photocells Connection with safety test See function F5 Safety devices test RX TX 10 11 E 5 10 TS 2 CX CY 10 11...

Page 36: ...d the keys open and close the gate Getting started Once the electrical connections have been made proceed with commissioning Only skilled and quali ed staff may perform this operation Make sure that t...

Page 37: ...er C3 appears only if the Automatic closing function is active F3 CY input OFF Default C1 Reopen while closing photocells C2 Reclose while opening photocells C3 Partial stop Only with Automatic close...

Page 38: ...on active the gate remains idle if the safety devices detect an obstacle The function is active when the gate is closed open or after a complete stop F9 Obstruction detection with motor idle OFF Defau...

Page 39: ...eypad selector default Thrust Before every opening or closing manoeuvre the leaves thrust inwards to release the electric lock F16 Thrust OFF Default ON Additional light Choose the operating mode of t...

Page 40: ...time Set the gearmotor working time during opening and closing F22 Operating time 5 to 180 seconds Default 120 M1 opening delay time It adjusts the delay with which the rst leaf must start the openin...

Page 41: ...sensitivity Adjusting the partial opening In single leaf gates it determines the leaf partial opening percentage with respect to the total travel In two leaf gates it determines the partial opening p...

Page 42: ...losing approach starting point for M2 percentage of the total travel F44 Closing approach point 1 to 10 Default 10 Number of motors Set the number of motors that control the gate F46 Number of motors...

Page 43: ...00 bps 4 14400 bps 5 19200 bps 6 38400 bps default 7 57600 bps 8 115200 bps RIO ED T1 Associate one of the available functions with a wireless safety device The function only appears if there is an in...

Page 44: ...ears if there is an interface board for wireless devices F68 RIO PH T2 OFF Default P1 Reopen while closing P2 Reclose while opening P3 Partial stop Only with Automatic close activated P4 Obstacle stan...

Page 45: ...ress ENTER to con rm CLr will appear to con rm deletion Remove all Remove all registered users U3 Remove all OFF Default ON Radio decoding Choose the type of radio coding for the transmitters enabled...

Page 46: ...e gate with the gearmotor connected to M1 N1 If the leaf does not move in the correct direction invert the motor phases A2 Motor test OFF Default ON Travel calibration Start the travel self learning T...

Page 47: ...during closing E10 Obstacle detected during opening E11 Maximum number of obstacles E14 Serial communication error E15 Incompatible remote control E17 Wireless system communication error E18 Wireless...

Page 48: ...he contents of this manual may be changed at any time and without notice Translation of the original instructions FINAL OPERATIONS Before closing up the casing check that the cable inlets are sealed t...

Page 49: ...Page 29 Manual FA01359 EN 03 2021 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions...

Page 50: ...Page 30 Manual FA01359 EN 03 2021 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions...

Page 51: ...Page 31 Manual FA01359 EN 03 2021 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions...

Page 52: ...AME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions CAME S p A Via Martiri della Libert 15 31030 Dosson di Casier Treviso Italy...

Reviews: