Network migration planning
PTP 450 Configuration and User
pmp-0815 (August 2015)
4-5
Sector capacity
Deployment scenario 1 – Replacing PTP 100 Equipment (20 MHz
Channel Bandwidth)
In Deployment scenario 1, it is presumed that the existing network is comprised of PTP
1x0 equipment (i.e. PTP 100, PTP 120, etc.), with the configuration listed below in
. The migration in this scenario results in a complete replacement of PTP 1x0 series
equipment with PTP 450 equipment.
During the Scenario 1, it is presumed that the neighbouring frequencies are free and that
a guard band is not required at the edges of the spectrum used for transmission.
Table 36
Deployment scenario 1
Term
Definition
Existing System Release
13.1.3
Existing Modulation
FSK
Existing Channel BW (MHz)
20
Existing Aggregate Throughput (Mbps)
14
Replace Legacy Subscribers with 450 BHSs
Required
Resulting Modulation
OFDM
(MIMO)
Resulting Channel BW (MHz)
20
Resulting Aggregate Throughput (Mbps)
132
Resulting Percentage Increase in Aggregate
Throughput
942%