Summary of Contents for XV2-2

Page 1: ...ams stored in semiconductor memories or other media Laws in the United States and other countries preserve for Cambium its licensors and other 3rd Party supplied software certain exclusive rights for copyrighted material including the exclusive right to copy reproduce in any form distribute and make derivative works of the copyrighted material Accordingly any copyrighted material of Cambium its li...

Page 2: ...ks of the copyrighted material Accordingly any copyrighted material of Cambium its licensors or the 3rd Party software supplied material contained in the Cambium products described in this document may not be copied reproduced reverse engineered distributed merged or modified in any manner without the express written permission of Cambium Furthermore the purchase of Cambium products shall not be d...

Page 3: ... USA and Canada specific information 6 Federal Communication Commission interference statement 6 Specific expertise and training required for professional installers 7 Avoidance of weather radars 7 Ethernet networking skills 8 Pole or tower mount guidelines 8 Wall mount guidelines 9 Training 10 Power density exposure limit 10 Calculation of power density and distance 11 Calculated distances and po...

Page 4: ...Enterprise Wi Fi AP Hardware Installation Guide List of Figures 2 List of Figures Figure 1 Grounding and lightning protection on pole or tower 9 Figure 2 Grounding and lightning protection on wall 10 ...

Page 5: ...Hardware Installation Guide List of Tables 3 List of Tables Table 1 Related documents 2 Table 2 Hardware platforms 3 Table 3 Antenna details 11 Table 4 Power density and distance 12 Table 5 Types of mounting the device 14 ...

Page 6: ...setting Up and configuring Cambium Network s AP Intended audience This guide is intended for use by the system designer system installer and system administrator Purpose Cambium Network s AP documents are intended to instruct and assist personnel in the operation installation and maintenance of the Cambium s equipment and ancillary devices It is recommended that all personnel engaged in such activ...

Page 7: ... Tri Radio indoor Access Point XV2 2 2x2 2 2x2 2 802 11a b g n ac wave 2 ax Dual Radio indoor Access Point Reporting problems security advice and safety and regulatory information This section includes the following topics Reporting problems Security advice Safety and regulatory information Reporting problems If any problems are encountered when installing or operating this equipment follow this p...

Page 8: ...tion This section describes important safety and regulatory guidelines that must be observed by personnel installing or operating Enterprise Access Point equipment Important safety information Warning To prevent loss of life or physical injury observe the safety guidelines in this section Power lines Exercise extreme care when working near power lines Working at heights Exercise extreme care when ...

Page 9: ...minal penalties Contact the Cambium helpdesk if more guidance is required Human exposure to radio frequency energy Relevant standards USA and EC applicable when working with RF equipment are ANSI IEEE C95 1 1991 IEEE Standard for Safety Levels with Respect to Human Exposure to Radio Frequency Electromagnetic Fields 3 kHz to 300 GHz Council recommendation of 12 July 1999 on the limitation of exposu...

Page 10: ...fferent from that to which the receiver is connected Consult the dealer or an experienced radio TV technician for help Attention Any changes or modifications not expressly approved by the party responsible for compliance could void the user s authority to operate this equipment This device complies with Part 15 of the FCC Rules Operation is subject to the following two conditions 1 This device may...

Page 11: ...hould be installed and operated with minimum distance 20 cm between the radiator and your body Cet équipement est conforme aux limites d exposition aux rayonnements IC établies pour un environnement non contrôlé Cet équipement doit être installé et utilisé avec un minimum de 20 cm de distance entre la source de rayonnement et votre corps CE statement This equipment complies with EU radiation expos...

Page 12: ...ollow the below requirements Ensure that the position of the equipment is lower than the top of the tower or its lightning air terminal Ensure that the metal tower or pole is correctly grounded Install a grounding kit at the first point of contact top between the drop cable and the tower Install a grounding kit at the bottom of the tower near the vertical to horizontal transition point Note If gro...

Page 13: ...u need to install AP on the wall of a building then in addition to the general protection requirements follow the below requirements also Ensure that the position of the equipment is lower than the top of the building or its lightning air terminal Ensure that the building is correctly grounded Connection examples of wall installations are shown in below figure ...

Page 14: ...tworks Enterprise Wi Fi AP must be gained by reading this User Guide and by performing sample setups at base workshop before live installments Power density exposure limit This section includes the following topics Calculation of power density and distance Calculated distances and power compliance margins Install the radios for the platform family of wireless solutions so as to provide and maintai...

Page 15: ...W m d Distance from point source in cm Centimeters Table 3 Antenna details AP Antenna Gain For 2 4 GHz in dBi Gain For 5 GHz in dBi XV3 8 Omnidirectional 5 1 6 7 XV2 2 Omnidirectional 5 4 6 3 For details on minimum safe distance value please refer Table 4 Calculated distances and power compliance margins Table 4 displays power density and minimum safe separation distance from point source for each...

Page 16: ... This User Guide 12 Table 4 Power density and distance Product Regulatory Domain Power density S mW cm Distance d cm XV3 8 FCC 0 21 0 33 31 IC 0 22 0 35 30 CE 0 197 7 47 2 4G 5G W m 20 XV2 2 FCC 0 45 0 505 25 IC 0 31 0 35 30 CE 0 1966 7 598 2 4G 5G W m 20 ...

Page 17: ...ium Networks Enterprise Wi Fi AP sales representative Package contents A complete Cambium Networks Enterprise Wi Fi AP package contains all the items listed below 1 Cambium Networks Enterprise Wi Fi AP 2 Quick Start Guide QSG a Specifications b Safety Notice c Compliance 3 Hardware Accessories Based on SKU Model a Mounting Kits Mounting the device This section includes the following topics Mountin...

Page 18: ...Point Wall Mount Ceiling Mount T bar Mount XV3 8 XV2 2 Mounting XV3 8 Ceiling Mount 1 Determine where XV3 8 needs to be mounted and remove the ceiling tile 2 Using the hole template mark the hole locations 3 Drill the holes for the 4 mounting screws using a 5mm 3 6 diameter drill bit Mounting Plate Ceiling Tile Mounting Bracket Screws x 4 ...

Page 19: ... on the mounting bracket 6 Run the RJ45 cable cables through the 15mm hole and remount the ceiling tile 7 Attach the RJ45 cable cables to XV3 8 8 Slide XV3 8 into the mounting bracket Wall Mounting The XV3 8 mounts to any wall by using two screws with corresponding wall anchors The ceiling mount bracket can be used as a template to align the screws with the unit T bar Mounting 38mm T Bar 38mm wide...

Page 20: ...T bar rail by using the ceiling mount bracket The A marking on the bracket is to be used for this width T bar rail 24mm T Bar The XV3 8 can be mounted to a 24mm width T bar rail using the clips built into the underside of the unit The B marking on the bracket is to be used for this width T bar rail 24mm wide T ball rail Mounting Bracket ...

Page 21: ...and Installation of Access Point 17 14mm T Bar The XV3 8 can be mounted to a 14mm width T bar rail using the clips built into the underside of the unit The C marking on the bracket is to be used for this width T bar rail 24mm wide T ball rail Mounting Bracket ...

Page 22: ...Drill the holes for the 4 mounting screws using a 5mm 3 6 diameter drill bit 4 Drill the RJ45 cable hole using a 15 mm 5 8 diameter bit 5 Hold the mounting plate on the top side of the ceiling tile and screw it on the mounting bracket 6 Run the RJ45 cable cables through the 15mm hole and remount the ceiling tile 7 Attach the RJ45 cable cables to XV2 2 8 Slide XV2 2 into the mounting bracket Mounti...

Page 23: ...o screws with corresponding wall anchors The ceiling mount bracket can be used as a template to align the screws with the unit T bar Mounting 38mm T Bar The XV2 2 can be secured to a 38mm ceiling T bar rail by using the ceiling mount bracket The A marking on the bracket is to be used for this width T bar rail 38mm wide T ball rail Mounting Bracket ...

Page 24: ...ps built into the underside of the unit The B marking on the bracket is to be used for this width T bar rail 14mm T Bar The XV2 2 can be mounted to a 14mm width T bar rail using the clips built into the underside of the unit The C marking on the bracket is to be used for this width T bar rail 24mm wide T ball rail Mounting Bracket 14mm wide T ball rail Mounting Bracket ...

Reviews: