Chapter 3
Preparing for Installation
This section provides instructions for transporting, inspecting, and unpacking the equipment for an
PTP 820F system prior to installation.
Transportation/Storage
The equipment cases are prepared for shipment by air, truck, railway and sea, suitable for handling
by forklift trucks and slings. The cargo must be kept dry during transport and storage.
For sea-transport, deck-side shipment is not permitted. Carrier-owned cargo containers should be
used.
It is recommended that the equipment is transported to the installation site in its original packing
cases.
If any intermediate storing is required, all cases must be stored under dry and cool conditions and
out of direct sunlight.
Inspection
Check the packing lists and ensure that correct parts numbers quantities of goods have arrived.
Inspect for any damage on the cases and equipment. Report any damage or discrepancy to a
Cambium representative, by e-mail or fax.
Unpacking Equipment at the Site
The equipment is packed in sealed plastic bags and moisture absorbing bags are inserted. Any
separate sensitive product, i.e. printed boards, are packed in anti-static handling bags. The
equipment is further packed in special designed cases.
Marking is done according to standard practice unless otherwise specified by customers.
•
Customers address
•
Contract No
•
Site name (if known)
•
Case No
Dimensions and weight of each case are specified in the packing specification issued for the
respective shipment.
Caution
It is essential that whenever unpacking or disassembling the equipment and handling
printed circuit boards, special precautions should be taken to avoid ESD (Electrostatic
Static Discharge). Generally, units with static discharge protection should not be
unpacked until the installation takes place.
Ensure you are properly grounded at a controlled ESD point before and during
unpacking and handling of any sensitive component.
To avoid malfunctioning or personnel injuries, equipment or accessories/kits/plug-in unit
installation, requires qualified and trained personnel.