Chapter 1: Before You Start
Pre-installation Instructions
phn-3962 004v000
Page 1-6
Pre-installation Instructions
Packing
The equipment must be packed and sealed in moisture absorbing bags.
Transportation and Storage
The equipment cases are prepared for shipment by air, truck, railway and sea, suitable for
handling by forklift trucks and slings. The cargo must be kept dry during transportation, in
accordance with ETS 300 019-1-2, Class 2.3. For sea-transport, deck-side shipment is not permitted.
Carrier-owned cargo containers must be used.
It is recommended that the equipment be transported to the installation site in its original packing
case.
If intermediate storage is required, the packed equipment must be stored in a dry and cool
environment, and out of direct sunlight, in accordance with ETS 300 019-1-1, Class 1.2.
Unpacking
The equipment is packed in sealed plastic bags and moisture absorbing bags are inserted. Any
separate sensitive product, i.e printed boards, are packed in anti-static handling bags. The
equipment is further packed in special designed cases.
Marking is done according to standard practice unless otherwise specified by customers. The
following details should be marked:
•
Customers address
•
Contract No
•
Site name (if known)
•
Case No
Inspection
Check the packing lists and ensure that correct parts numbers quantities of goods have arrived.
Inspect for any damage on the cases and equipment. Report any damage or discrepancy to
Cambium Networks support by e-mailing to [email protected].