Chapter 5: Installation Procedure and Antenna Alignment
–
1+0 with
43 dBi Flat Antenna and Alignment Device
Attaching the RFU-E to the Installation and Alignment Device
phn-4026 003v000
Page 5-49
Attaching the RFU-E to the Installation and
Alignment Device
1.
Connect the RFU-E unit to the installation and alignment device, using the two M8 screws and washers
supplied with the installation and alignment kit. Attach the RFU-E according to the desired polarization, as
shown in the figures below. Note that:
o
For vertical polarization, the upper screw must be approximately 2:00 to the right, the lower screw must
be approximately 8:00 to the left, and the RSL interface should be at approximately 9:00 to the left.
o
For horizontal polarization, the upper screw must be approximately 10:00 to the left, the lower screw
must be approximately 4:00 to the right, and the RSL interface should be at the bottom.
Figure 10: Horizontal Polarization
–
Radio and
Installation and Alignment Kit
Figure 11: Horizontal Polarization
–
Screws
Location