PMP 450 Planning Guide
Figure 26 Grounding and lightning protection on building
Error! No topic specified.
Protection inside a high rise building
The following protection requirements must be observed inside multi-story or high rise buildings (
•
The drop cable shield must be bonded to the building grounding system at the entry point to the building.
•
The drop cable shield must be bonded to the building grounding system at the entry point to the equipment
area.
Figure 27 Grounding and lightning protection inside high building
Error! No topic specified.
1-114
pmp-0047 (March 2014)
Summary of Contents for PMP 450
Page 1: ...Cambium PMP 450 Planning Guide System Release 13 1 ...
Page 13: ...PMP 450 Planning Guide pmp 0047 March 2014 1 3 ...
Page 42: ...PMP 450 Planning Guide Figure 14 Custom Frequency tab of the SM 1 32 pmp 0047 March 2014 ...
Page 58: ...PMP 450 Planning Guide Figure 16 AP web based management screenshot 1 48 pmp 0047 March 2014 ...
Page 82: ...PMP 450 Planning Guide 1 72 pmp 0047 March 2014 ...
Page 155: ...PMP 450 Planning Guide pmp 0047 March 2014 1 145 ...