Calix ODC-80 Installation Guide
43
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© 2001-2003 Calix. All Rights Reserved.
Installing Outside Plant Cables
Subscriber cables
Route copper subscriber cables into the copper splice compartment on the left side of the
ODC-80 then terminate the cables to the factory installed equipment cables.
Install copper protection modules in the copper protection compartment at the rear of the
cabinet.
Note
You can route subscriber cable through any one of the cable
entry locations. For best results with a high copper count
configuration, route the cable to the right.
Summary of Contents for ODC-80
Page 1: ...Calix ODC 80 Installation Guide July 2003 Part 220 00029 Rev 11 ...
Page 2: ......
Page 6: ......
Page 7: ...1 Chapter Before You Begin Installing the ODC 80 ...
Page 8: ......
Page 23: ...2 Chapter Placing the ODC 80 on a Pad ...
Page 24: ......
Page 30: ......
Page 31: ...3 Chapter Installing Power Subscriber Cables and Equipment ...
Page 32: ......
Page 74: ......
Page 75: ...4 Chapter Maintaining and Troubleshooting the ODC 80 ...
Page 76: ......
Page 80: ......
Page 92: ......
Page 103: ...5 Chapter Reference ...
Page 104: ......
Page 106: ......