User Manual - Rev AJ
California Instruments
check the connections and phase measure
measurement readings you get are indeed
ments if this is not the case to make sure the
correct.
If it is necessary to adjust the pots, see Table 6-6 for the corresponding pot designators. The
top
e
the
boa
hase B/C board (7000-722).
erence
cover has to b removed to access these pots. They are located along the top edge of
controller board(s). For Series I MX units, adjustments for phase A are on the phase A
rd (7000-721), adjustments for phase B and C are on the p
For Series II MX units, all adjustments are on the 7003-718 controller board. The ref
designators are the same on either series controller.
12. Repeat steps 2 through 11 for phase B and C. (except on single phase only models).
MX Series I
R resistive
Xl inductive
Phase / Board #
Phase A (7000-721)
R121
R122
Phase B (7000-722)
R112
R111
Phase C (7000-722)
R114
R115
MX Series II
R resistive
Xl inductive
Phase / Board #
Phase A (7003-718-2 / -4)
R121
R122
Phase B (7003-718-2)
R112
R111
Phase C (7003-718-2)
R114
R115
Table 6-6: Programmable Z adjustment pots
Definitions:
V
NL
= Measured RMS voltage under no load.
V
L
= Measured RMS voltage under load
I = Measured RMS current.
F = Source frequency (50 Hz).
∆Φ
= Ph
angle shift between load and no load conditions. Record pha
ase
se angle
from phase meter under NL and L condition and determine phase shift.
Formulas to calculate R and L component of output impedance:
R = ( V
NL
* cos(
∆Φ
) - V
L
) / I
X
L
= ( V
NL
* sin(
∆Φ
)) / I
L = X
L
/ (2 * Pi * F)
Table 6-7: Formulas to calculate R and L
MX Series
175