California Faucets Arpeggio CF-TO-VE402-7 Installation Instructions Download Page 2

CF-TO-VE402-7_ii_190425 

 

 

 

 

Pg 2 

ALIGN & TRIM VALVE STEM 

 

Remove mudguards from VALVE (

1

)

 

 

 

To obtain proper HANDLE (

7

) alignment it may be 

necessary  to  re-align  cartridge  STEM  (

1b

);  to  align 

STEM (

1b

), slightly loosen the cartridge NUT (

1d

), 

place HANDLE (

7

) on STEM (

1b

) and 

TIGHTEN

 

in CW direction until desired alignment is achieved; 

retighten  cartridge  NUT  (

1d

)  to  factory  torque 

setting of 14 ft-lbs. 

 

WARNING:   

Cartridge  NUT  (

1d

MUST

  be  properly  torqued  to 

prevent possible failure and/or water damage

 

 

 

Using  a  marker  indicate  a  distance  of  3/16

  from 

finished wall on ALL-THREAD (

1c

 

 

Unscrew ALL-THREAD (

1c

) from valve STEM (

1b

)

 

 

Cut STEM (

1b

)

 

7/8

 

from finished wall surface 

 

 

Cut off excess ALL-THREAD (

1c

) at indicated mark 

and  reattach  ALL-THREAD  (

1c

)

 

onto  valve  STEM 

(

1b

)

 

 repeat on other side

 

 

 
 
 
 
 
 
 

INSTALLING ESCUTCHEON

 

 

 

Tighten  handle  ESCUTCHEON  (

6

)  onto  ALL-

THREAD (

1c

)

 

 

 

 

 

 

 

 

 

 

INSTALLING HANDLE

 

 

Loosen SETSCREW (

7a

)

 

 

 

Slide  HANDLE  (

7

)  down  onto  and  engage  valve 

STEM (

1b

) leaving a space of 1/32” between handle 

and handle ESCUTCHEON (

6

 

Tighten SETSCREW (

7a

)

 

 

 

Turn on water supply and check for leaks 

 

 
 
 

californiafaucets.com    

5271 Argosy Ave. Huntington Beach, CA 92649    800-822-8855

 

1b 

1c 

1d 

(13/16” hex)

 

1c 

1b 

1d 

1b 

1c 

1b 

7a 

1c 

7/8

 

3/16

 

1c 

1b 

Reviews: