
CF-TO-VE402-7_ii_190425
Pg 2
2
3
4
v
ALIGN & TRIM VALVE STEM
•
Remove mudguards from VALVE (
1
)
•
To obtain proper HANDLE (
7
) alignment it may be
necessary to re-align cartridge STEM (
1b
); to align
STEM (
1b
), slightly loosen the cartridge NUT (
1d
),
place HANDLE (
7
) on STEM (
1b
) and
TIGHTEN
in CW direction until desired alignment is achieved;
retighten cartridge NUT (
1d
) to factory torque
setting of 14 ft-lbs.
WARNING:
Cartridge NUT (
1d
)
MUST
be properly torqued to
prevent possible failure and/or water damage
•
Using a marker indicate a distance of 3/16
”
from
finished wall on ALL-THREAD (
1c
)
•
Unscrew ALL-THREAD (
1c
) from valve STEM (
1b
)
•
Cut STEM (
1b
)
7/8
”
from finished wall surface
•
Cut off excess ALL-THREAD (
1c
) at indicated mark
and reattach ALL-THREAD (
1c
)
onto valve STEM
(
1b
)
–
repeat on other side
INSTALLING ESCUTCHEON
•
Tighten handle ESCUTCHEON (
6
) onto ALL-
THREAD (
1c
)
INSTALLING HANDLE
•
Loosen SETSCREW (
7a
)
•
Slide HANDLE (
7
) down onto and engage valve
STEM (
1b
) leaving a space of 1/32” between handle
and handle ESCUTCHEON (
6
)
•
Tighten SETSCREW (
7a
)
•
Turn on water supply and check for leaks
californiafaucets.com
5271 Argosy Ave. Huntington Beach, CA 92649 800-822-8855
7
1b
1c
1d
(13/16” hex)
1
1c
1b
1
1d
1b
1c
1b
7a
7
6
1c
6
7/8
”
3/16
”
1c
1b